MxAPS for Microsoft Dynamics 365 Business Central
Schedule production against the capacity you actually have
Automated finite capacity production scheduling, built into Business Central.
MxAPS sequences production orders in Microsoft Dynamics 365 Business Central against real machine capacity, using scheduling rules you define, and returns a forward schedule the shop floor can work to. Each run reports how many order lines are late, early, and on time, and nothing changes in Business Central until you commit the result.
- Business Central extension
- Cloud and on-premises
- Licensed by production orders scheduled at once
- Rating on Microsoft Marketplace
- 5.0
- Installs
- 500+
MxAPS resources
How MxAPS helps
Finite capacity
Replace an overloaded schedule with one the floor can run
When every order is planned to its due date without regard for what each machine is already running, work piles onto the same machine center on the same afternoon. Someone then has to rework the schedule by hand, one operation at a time.
MxAPS schedules forward from a start date and time you choose, placing each operation against the actual capacity of your work centers and machine centers. Where an operation has alternate machines, it weighs preferences, quantity limits, and setup and run time multipliers, and can choose a slower machine when that produces a better overall schedule.
See all MxAPS features ↓Scheduling rules
Turn your scheduler's know-how into rules
Many plants depend on one or two people who know which jobs go first and which machines suit which parts. When they are away or overloaded, the schedule and the shop floor both suffer.
MxAPS scheduling rules rank operations by the criteria you set, such as priority, due date, and order number, in a processing order you control. Production cells, lot and order families, and secondary constraints for material, tooling, and labor capture the rest of your plant's logic as configuration.
See all MxAPS features ↓Review before commit
Compare schedule results before anything changes
A schedule that rewrites production dates the moment it runs leaves no room to test a change, such as adding a shift, before the floor sees it.
Every run creates a numbered schedule result with its own counts of late, early, and on-time lines and its total setup and run time. Only one result is active, and Commit Results writes starting and ending dates and times to the production order routing lines when you decide to use it.
See all MxAPS features ↓Maintenance windows
Place maintenance where it disrupts production least
Taking a machine down at a fixed time can collide with high-priority orders due the same day. The maintenance gets done, and the order book pays for it.
Once Maintenance Manager, Insight Works' maintenance management app, or a person has decided that servicing is needed, MxAPS schedules the window against the same capacity model as production. Deciding when equipment needs service stays with that app or person.
See all MxAPS features ↓MxAPS screenshots
Real screens from MxAPS in Business Central, shown with demo data.
MxAPS features
18 features in 3 groups. Each one has its own page with screens, steps, and answers to common questions.
Scheduling engine
- Forward Finite Capacity SchedulingSchedule forward from a chosen start date and time against real work center and machine center capacity.
- Scheduling RulesRank operations by criteria such as priority and due date, in a processing order you define.
- Production CellsGroup work centers, machine centers, and operations into cells and set the order they are scheduled in.
- Alternate MachinesGive an operation a group of eligible machines with preferences, quantity limits, and setup and run time multipliers.
- Secondary ConstraintsModel material, tooling, and labor as constraints so the schedule respects them.
- Lot Splitting and Order SetsSplit lots across machines and keep matching operations together on one machine.
- Lot and Order FamiliesRun related work together to save setup time.
- Just-in-Time SchedulingLimit how early an operation can finish before its due date with maximum early days.
- Transfer TimesSet transfer times between specific work center and machine center pairs.
- Maintenance WindowsSchedule maintenance that has already been decided against the same capacity model as production.
Results
- Schedule ResultsEach run creates a numbered result with late, early, and on-time counts and total setup and run time.
- Detail TablesReview operation schedules, machine load details, and how each operation's rank was derived.
- Adjust and RescheduleChange class, priority, order set, split quantity, or machine on a result, then reschedule.
- Commit ResultsWrite starting and ending dates and times to production order routing lines when you choose.
- Dispatch ListsFilter operation schedules by machine center to give each work area its sequence.
Setup
- Assisted SetupSet up through a wizard, with an option to load demo data for test and training environments.
- Per-User ConfigurationsScheduling configurations remember the last values each user ran.
- Timeline ViewDisplay MxAPS results on a timeline in Graphical Scheduler, Insight Works' free visual scheduling app.
MxAPS videos
6 videos on setting up and using MxAPS, in the order most people need them.

2 min
How MxAPS assigns work to machine centers
For production planners who assign orders to work centers and want the schedule to pick the machine.

2 min
Forward and backward scheduling with MxAPS
For production planners who want start and finish dates based on the resources available today.

2 min
How MxAPS sequences jobs and splits lots
For production planners who want setup time and machine load considered when the schedule is built.

2 min
Schedule non-production time with MxAPS
For production managers who need time for material moves, cool-downs, and changeovers on the schedule.

2 min
Plan downtime and machine maintenance with MxAPS
For production and maintenance managers who want maintenance planned around run hours and the schedule rebuilt when a machine is down.

2 min
Schedule with fractional labor in MxAPS
For production managers with more machines than people to run them.
Will it fit your setup?
Does MxAPS support Business Central on-premises, and which versions?
Yes. MxAPS runs on Business Central online and on-premises. Your Microsoft Partner can confirm the on-premises versions supported for your environment.
Requirements and licensing
Licensed by scheduling capacity
MxAPS is a subscription licensed per company, in tiers by the number of production orders scheduled at one time. Schedule runs within a tier are unlimited, and licensing is not per user or per location.
Business Central license
Users who work in MxAPS need a full user license on the Business Central Premium tier.
Manufacturing setup in place
MxAPS needs routings, work centers, and machine centers in Business Central, with every machine center assigned to a work center. Production cells, a number series, and at least one schedule configuration are also required.
Hosted scheduling engine
The scheduling engine runs as a remote service hosted in Azure and connects to Business Central. Very complex environments, above roughly 20,000 operation combinations scheduled at once, may need premium hosting at additional cost.
Deployment
MxAPS is delivered as a Business Central extension. Your Microsoft Partner can confirm support for your Business Central version and deployment.
GET A QUOTE
Your Microsoft Partner prepares a quote for your setup.
App details and prerequisites
- Delivery
- Business Central extension
- Insight Works license
- Per company, subscription, tiered by production orders scheduled at once
- Business Central license
- Full user license (Premium tier)
- Languages
- English
- Availability
- All countries where Business Central is available
What customers say about MxAPS
“MxAPS has revolutionized our operations with its real-time reporting, flexible scheduling options, and excellent scalability.”
Microsoft Marketplace review “Using MxAPS has streamlined our production planning, improved inventory management, and significantly increased our productivity.”
Microsoft Marketplace review
Case studies
Questions about MxAPS?
Ready to plan a rollout? Contact your Microsoft Partner. For product questions, send us a note and the MxAPS team will reply by email. Scoping MxAPS for a project? Book a Q&A session with the product manager.






