Secondary Constraints for Microsoft Dynamics 365 Business Central
A machine with free time is not much use if the mold is on another press, the trained operator is off shift, or the component has not arrived. MxAPS, Insight Works' finite capacity production scheduling app for Business Central, models material, tooling, and labor as secondary constraints, so the schedule respects them alongside machine capacity.
How Secondary constraints works in MxAPS
- The team identifies what besides machine time limits production: components, tools, or skilled people.
- An administrator sets up each constraint at the right level: work center, BOM, order component, or machine alternate.
- Item Card settings mark which items constrain the schedule and which are only tracked.
- When a schedule runs, the engine places operations only where machine time and constraints allow.
- The result shows which operations moved out because a constraint was not met.

Key capabilities
Material
Items can constrain the schedule. MxAPS projects inventory balances and holds back operations whose components will not be available, rather than scheduling them as if the material were there.
Tooling
A tool such as a mold can be modeled as a constraint, so the schedule respects when that tool is available.
Labor
Labor is modeled as an item with a shift code attached, so an operation that needs a particular skill is scheduled when that skill is on shift.
Where each constraint goes
Generic to a work center: Machine Constraints. Specific to an item: the production bill of materials (BOM). Specific to an order: production order components. Specific to one machine and operation: Machine Alternate Constraints.
Item Card settings
On the Item Card, set whether an item constrains the schedule or is only tracked, its fence type and tolerance, and minimum and maximum levels.
Precise values
Secondary constraint tables accept values to five decimal places, for constraints measured in small fractions.
Details that matter on the floor
Scheduling, not inventory management
MxAPS projects inventory to schedule against it. It does not post or adjust inventory; Business Central still does that.
Pick the narrowest level
Placing a constraint at the most specific level that is true, such as one machine and operation instead of a whole work center, keeps the schedule from being held back where it does not need to be.
Who uses Secondary constraints
Production engineers
Model tools, materials, and labor at the right level.
Supply chain managers
See when missing material will push operations out.
Production planners and schedulers
Get a schedule the floor can run, with tools and people available.
Questions about Secondary constraints
Can MxAPS schedule around material shortages?
Yes. When an item is set to constrain the schedule, MxAPS projects its inventory and defers operations whose components will not be available.
Can I schedule around tooling and labor?
Yes. Tooling and labor can be modeled as secondary constraints. Labor is modeled as an item with a shift code attached.
Does MxAPS adjust inventory?
No. It projects inventory balances to schedule against them. Posting and adjustments stay in Business Central.
Where do I set up a constraint?
It depends on scope: Machine Constraints for a work center, the production BOM for an item, production order components for one order, and Machine Alternate Constraints for one machine and operation.
Related MxAPS features
All MxAPS features →Part of MxAPS
Automated finite capacity production scheduling, built into Business Central.
Have a question about Secondary constraints?
Send us a note and the MxAPS team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.