Just-in-Time Production Scheduling for Microsoft Dynamics 365 Business Central
Scheduling every job as early as possible keeps machines busy but fills the floor and the warehouse with work that is not due for weeks. MxAPS, Insight Works' finite capacity production scheduling app for Business Central, limits how early an operation can finish before its due date with maximum early days.
How Just-in-time production scheduling works in MxAPS
- An administrator sets the default maximum early days in MxAPS Setup.
- The planner runs a schedule.
- MxAPS keeps operations from finishing earlier than the limit allows.
- The planner reviews the early count and adjusts the limit if too much or too little work is pulled forward.
Key capabilities
Maximum early days
Set how many days before its due date an operation may finish. MxAPS does not schedule work earlier than that.
A default in setup
MxAPS Setup holds the default maximum early days, so every run follows the same rule unless changed.
Early is measured
Each schedule result counts early order lines alongside late and on-time lines.
Allowances per line
Result lines carry early and late time allowances, which show how much slack each line has.
See Just-in-time production scheduling on screen
Real screens from MxAPS, shown with demo data.
Details that matter on the floor
Less work waiting
Holding work back to within a set window of its due date keeps work in process and finished stock from building up ahead of demand.
Who uses Just-in-time production scheduling
Production planners and schedulers
Balance machine use against how early work finishes.
Operations managers
Keep work in process down on the shop floor.
Questions about Just-in-time production scheduling
Can MxAPS stop work from being scheduled too early?
Yes. Maximum early days limit how early an operation can finish before its due date.
Where is maximum early days set?
A default is set in MxAPS Setup.
How do I see how much work is early?
Each schedule result reports the number of early order lines, and result lines show early and late time allowances.
Related MxAPS features
All MxAPS features →Part of MxAPS
Automated finite capacity production scheduling, built into Business Central.
Have a question about Just-in-time production scheduling?
Send us a note and the MxAPS team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.