Work Center Transfer Times for Microsoft Dynamics 365 Business Central
Moving parts from one end of the plant to the other takes time, and a schedule that starts the next operation the moment the last one ends will be late every time. MxAPS, Insight Works' finite capacity production scheduling app for Business Central, sets transfer times between specific work center and machine center pairs.
How Work center transfer times works in MxAPS
- Production engineers note how long work takes to move between pairs of work centers and machine centers.
- They enter transfer times for those pairs in MxAPS.
- When the schedule runs, MxAPS leaves the transfer time between consecutive operations on those resources.
- Planners see realistic gaps between operations in the result.
Key capabilities
Per pair
Define a transfer time from one work center or machine center to another. Moves between machines side by side can be short while moves across the plant are longer.
Different from move time
Business Central has a move time on each routing operation. Transfer times in MxAPS depend on where the work is going, not only on the operation.
Built into every run
Once set, transfer times apply whenever the schedule runs, so the next operation starts after the move is done.
Pairs with cells
Transfer times sit naturally alongside production cells that follow the plant's flow.
Details that matter on the floor
Accuracy is won in setup
Transfer times are one of the details, like alternates and cells, where scheduling accuracy is actually won.
Who uses Work center transfer times
Production engineers
Measure and maintain transfer times between resources.
Production planners and schedulers
Get schedules that allow for movement across the plant.
Questions about Work center transfer times
What is a transfer time in MxAPS?
The time to move work between a specific pair of work centers or machine centers, which MxAPS allows for when it schedules consecutive operations.
How is it different from move time in Business Central?
Business Central's move time belongs to a routing operation. An MxAPS transfer time depends on the pair of resources the work moves between.
Are transfer times applied automatically?
Yes. Once transfer times are set, every scheduling run allows for them between consecutive operations on those resources.
Related MxAPS features
All MxAPS features →Part of MxAPS
Automated finite capacity production scheduling, built into Business Central.
Have a question about Work center transfer times?
Send us a note and the MxAPS team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.