When the preferred machine for a job is booked solid, a scheduler who knows the shop moves the job to another machine that can do it, even if it runs slower. MxAPS, Insight Works' finite capacity production scheduling app for Business Central, captures that choice with machine alternate groups: each operation can carry a group of eligible machines with preferences, quantity limits, and setup and run time multipliers.

How Alternate machine scheduling works in MxAPS

  1. Production engineers list the machines that can run each operation and how they compare.
  2. They build alternate groups with preferences, quantity limits, and multipliers.
  3. They assign the groups to routing operations.
  4. When a schedule runs, the engine places each operation on the machine that gives a better overall schedule.
  5. Planners can still move an operation to another machine on the result and reschedule.
Video thumbnail: How MxAPS assigns work to machine centers
How MxAPS assigns work to machine centers For production planners who assign orders to work centers and want the schedule to pick the machine. Transcript and details →

Key capabilities

Machine alternate groups

An alternate group lists the work centers and machine centers that can run an operation. The group is assigned to routing operations.

Preferences

Each alternate carries a preference duration, so the engine favors the preferred machine and uses others when that produces a better overall schedule.

Quantity gates

Minimum and maximum order quantities keep small jobs off large machines, or large lots off a machine that cannot handle them.

Multipliers

Setup and run time multipliers reflect that an alternate may take longer or less time than the preferred machine, so the schedule shows realistic durations.

Active flag

An alternate can be marked inactive, for example while a machine is being rebuilt, without deleting it from the group.

Constraints per alternate

Machine Alternate Constraints hold material, tooling, or labor limits that apply only to one machine and operation. See secondary constraints.

Details that matter on the floor

Slower can be better

A long bracket's preferred press brake may be overloaded. Placing it on an alternate that takes twice as long to run can still finish the whole order book sooner.

The decision shows in the result

The schedule result shows which machine each operation landed on, so a planner can see where alternates were used.

Who uses Alternate machine scheduling

Production engineers

Define which machines can run each operation and how they compare.

Production planners and schedulers

Let the schedule use alternates, and override a machine choice when needed.

Plant managers

Get more out of existing equipment when one machine is the constraint.

Questions about Alternate machine scheduling

Can Business Central schedule an operation on an alternate machine?

Yes, with MxAPS. Each operation can carry a group of eligible machines with preferences, quantity limits, and setup and run time multipliers, and the engine uses an alternate when that gives a better overall schedule.

How do I tell MxAPS a machine is slower?

Set setup and run time multipliers on that alternate, so its scheduled duration reflects how long it really takes.

Can I keep small jobs off a large machine?

Yes. Use the minimum and maximum order quantities on each alternate.

Can I override the machine MxAPS chose?

Yes. Move the operation to another machine on the schedule result, then reschedule.

MxAPS app icon

Part of MxAPS

Automated finite capacity production scheduling, built into Business Central.

Have a question about Alternate machine scheduling?

Send us a note and the MxAPS team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.