Production Scheduling Rules for Microsoft Dynamics 365 Business Central

In many plants the sequencing rules live in one experienced scheduler's head, and the schedule suffers when that person is on vacation or overloaded. MxAPS, Insight Works' finite capacity production scheduling app for Business Central, turns those rules into configuration: scheduling rules rank operations by criteria such as priority and due date, in a processing order you define.

How Production scheduling rules works in MxAPS

  1. The scheduling team agrees on how work should be sequenced, for example by due date, then class, then operation number.
  2. An administrator builds a scheduling rule with those parameters in processing order.
  3. When a schedule runs, MxAPS sorts operations by the rule and assigns each a rank.
  4. The engine schedules operations in rank order against capacity and constraints.
  5. The planner reviews the result and adjusts priorities if needed.

Key capabilities

Criteria in sequence

A rule lists parameters, such as priority, due date, a user attribute, order number, and order attribute key, each with a processing order. MxAPS sorts operations by the first parameter, then the next, and so on.

Buckets, then a rank

Sorting places operations into buckets in ascending processing order, which produces a rank for every operation. The engine uses that rank as its pick list when it decides what runs next.

Priorities you control

Order priority is one of the criteria, and a default order priority is set in MxAPS Setup, so urgent work can be raised without touching due dates.

See how a rank was built

The Order Attribute Schedules table shows how each operation's rank was derived. See detail tables.

Change and rerun

Change a priority or class on a result and reschedule to see how the ranking changes the schedule.

See Production scheduling rules on screen

Real screens from MxAPS, shown with demo data.

Details that matter on the floor

Rules outlast people

Once the sequencing logic is a rule, anyone can run the schedule and get the same answer, whether or not the most experienced scheduler is in that day.

Rank explains the order

Because every operation's rank can be traced back to the rule, a planner can explain why one job runs before another.

Who uses Production scheduling rules

Production planners and schedulers

Encode the plant's sequencing logic and adjust priorities when customers change their minds.

Operations analysts

Check how ranks were derived when a result looks wrong.

Plant managers

Make sure the schedule follows the plant's agreed priorities.

Questions about Production scheduling rules

Can I define my own production scheduling rules in Business Central?

Yes, with MxAPS. Scheduling rules rank operations by criteria such as priority, due date, order number, and attributes, in a processing order you define.

How does MxAPS use a scheduling rule?

It sorts operations by the rule's parameters in processing order, producing a rank for each operation. The scheduling engine then uses that rank to choose what runs next.

Can I see why an operation was ranked where it was?

Yes. The Order Attribute Schedules table shows how each operation's rank was derived.

Can I raise one order's priority?

Yes. Change its priority or class on the schedule result and reschedule.

MxAPS app icon

Part of MxAPS

Automated finite capacity production scheduling, built into Business Central.

Have a question about Production scheduling rules?

Send us a note and the MxAPS team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.

Ask a product question

Product Questions