For production planners who want setup time and machine load considered when the schedule is built.

Recorded December 6, 2021 · 2 minutes

MxAPS optimizing schedules video thumbnail

Summary

MxAPS weighs priority, setup time, and job parameters when it builds a production schedule in Business Central. The video shows sequencing, such as grouping three jobs that need similar tooling changes to reduce setup time, or running jobs from light to dark or hot to cold. It also shows lot splitting: a 10,000 unit order can be split into smaller lots, block quantities across several machines, or runs over several days.

Key topics

  • Group similar jobs to reduce setup time
  • Sequence jobs from light to dark or hot to cold
  • Split a large order across machines or days
Read the transcript

For those using or looking to use Dynamics 365 Business Central to help manage production schedules, then look no further than the MxAPS app from Insight Works. In this video, we will talk about how manufacturers can optimize production schedules. There can be many factors to consider when creating production schedules. Maybe you’re lucky and have brilliant people who understand every detail and create perfect production schedules. For the rest of you, Dynamics 365 Business Central with the MxAPS app can help optimize schedules. Take sequencing for example. MxAPS understands job parameters and will consider priority, setup time, job parameters and other variables to optimize schedules. Let’s say you have five different jobs.

Three of these jobs require minor tooling changes. MxAPS will group these three similar jobs to minimize setup time. Sequencing also includes things like running jobs from light to dark or from hot to cold. For some manufacturers, lot splitting is important when operating in a high volume environment. Let’s say you have an order for 10,000 widgets and you know you cannot run all of the units on one machine because it will tie up that machine for a week. MxAPS can split the job up in a few different ways, including smaller lots, specific block quantities across multiple machines, over several days or other specified rules. So if you want to regularly create realistic production schedules without relying on people to understand all of the scheduling details, then you’ll want to take a look at MxAPS from Insight Works. To learn more, check out the MxAPS website or reach out to your Microsoft partner.