Schedule non-production time with MxAPS
For production managers who need time for material moves, cool-downs, and changeovers on the schedule.

Summary
Not all shop floor time belongs to a production order: materials move between operations and equipment needs time to cool. MxAPS adds parameters for this non-production time, so it is scheduled and the time spent is tracked. The video also shows how MxAPS models different setup values, for example running a 30 minute color change before a two hour retooling, and grouping orders that use the same tooling.
Key topics
- Schedule material moves and cool-down time
- Track time spent on non-production tasks
- Model different setup times, such as color changes and retooling
- Group orders that use the same tooling
Read the transcript
For those using or looking to use Dynamics 365 Business Central to help manage production schedules, then look no further than the MxAPS app from Insight Works. In this video, we are going to talk about non-production scheduling. When running a manufacturing operation, it is important to account for both production and non-production time. Shop floor staff cannot always allocate their time to a specific production order. For example, maybe materials need to be moved from one operation to another, or equipment needs to cool before being used again. With MxAPS, users can add parameters for those that require non-production scheduling. The benefit is that non-production activity gets appropriately scheduled, and the time allocated to non-production tasks is tracked.
For more sophisticated manufacturing processes, MxAPS will model different setup values to determine the optimal schedule. Take injection molding, for example. Retooling the injection molding equipment may take two hours, where a color change may only require 30 minutes. In this case, it will be more efficient to run the job with the color change before retooling for another job. MxAPS will consider the same tooling used for different production orders, and group them together when it makes sense. So if you want to regularly create realistic production schedules without relying on people to understand all of the scheduling details, then you’ll want to take a look at MxAPS from Insight Works. To learn more, check out the MxAPS website, or reach out to your Microsoft partner.
Questions about this webcast?
Send your question and the Insight Works team will reply by email. Ready to plan a project? Contact your Microsoft Partner.
Ask a question
The app in this recording
More recordings
Video · 15 minBusiness Central production scheduling in minutes, not hoursGraphical Scheduler · MxAPSRecorded November 2026
Product video · 2 minHow MxAPS assigns work to machine centersMxAPSRecorded December 2021
Product video · 2 minForward and backward scheduling with MxAPSMxAPSRecorded December 2021