MxAPS is a finite-capacity advanced planning and scheduling solution for Microsoft Dynamics 365 Business Central. Use the resources below to install and configure MxAPS, understand how scheduling decisions are made, generate and review schedules, configure constraints, optimize sequencing, and troubleshoot unexpected results.
Getting Started, Installation, and Administration
- Introduction
- Install and Uninstall MxAPS
- Set Up MxAPS
- Configure MxAPS Manually or for Advanced Functionality
- Permission Sets for MxAPS
- MxAPS 4.1 Upgrade Actions
- Release Notes: MxAPS
Understanding How MxAPS Scheduling Works
Start here to understand the fundamental scheduling behavior of MxAPS, including finite forward scheduling, constraints, lead times, and the reasons operations may move.
- MxAPS User Guide Introduction
- Understanding Scheduling Constraints in MxAPS
- Does MxAPS Schedule Forward or Backward?
- Understanding MxAPS Lead Time, Fence Type, and Material Availability
- Understanding Why MxAPS Moved My Production Order
- How MxAPS Handles Schedule Changes, Manual Moves, and Long-Lead-Time Orders
- Understanding Idle Allowance vs. Absolute Allowance in MxAPS
Generating and Controlling a Schedule
Use these articles when deciding what MxAPS should schedule and how a schedule should be generated.
- How to Generate an MxAPS Schedule
- Generate Schedule
- Which Production Order Statuses Should I Include in an MxAPS Schedule?
- Scheduling Configurations
- How to Configure a Rush Order in MxAPS
- Preventing Lower-Ranked Orders from Filling Schedule Gaps
- Delay Increment
Scheduling Rules, Priorities, and Sequencing
Scheduling rules determine which production orders MxAPS attempts to schedule first. These articles cover ranking, sequencing, grouping, and order attributes.
- Scheduling Rules
- Scheduling Rule Card
- Scheduling Rule Parameters
- Schedule Rule Details
- Segment Codes
- Order Attribute Schedules
- Grouping Production Operations into Order Sets in MxAPS
- Sequencing Similar Jobs and Reducing Changeovers in MxAPS
Capacity, Machines, Labor, and Other Resources
Configure the capacity and resource constraints that determine where and when an operation can run.
- Production Cells
- Machine Constraints
- Resource Requirements
- Using Tooling and Labor as Secondary Constraints in MxAPS
- Using Work Centers with Interchangeable Machine Centers in MxAPS
- Machine Alternate Constraints
- Alternate Group List
- Alternate Group Card
Inventory and Material Constraints
MxAPS can consider available inventory and component requirements when determining when production can begin.
- How MxAPS Uses Inventory During Scheduling
- How to Identify Material Shortages in an MxAPS Schedule
- Inventory Availability Constraints for Multi-Level BOMs with MxAPS
- Production BOM Component Constraint Setup
- Mx Item Card extends Item Card
Calendars, Availability, and Transfers
Use these features to model when resources are available and the time required to move work between resources.
Setup Time and Changeover Optimization
MxAPS can sequence compatible jobs and eliminate eligible setup time to produce a more efficient schedule.
- How MxAPS Reduces Changeovers
- Sequencing Similar Jobs and Reducing Changeovers in MxAPS
- How to Use Setup Eliminations to Reduce Setup Time
- Configuring Native Setup Eliminations
- Setup
- Understanding Idle Allowance vs. Absolute Allowance in MxAPS
Reviewing and Analyzing Schedule Results
After generating a schedule, use these pages and tools to understand where orders and operations were placed and why.
- Understanding the Machine Schedule Summary in MxAPS
- How to Identify Which Production Orders Are Shown in the Machine Schedule Summary
- Schedule Result List / Schedule Results
- Schedule Result
- Order Schedule List
- Operation Schedules
- Machine Load Details
- Order Attribute Schedules
- Result KPI FactBox
Modifying and Committing the Schedule
MxAPS calculates the schedule, while users can review or adjust the result before committing scheduling changes back to Business Central.
- How to Modify an MxAPS Schedule
- How MxAPS Handles Schedule Changes, Manual Moves, and Long-Lead-Time Orders
- Commit Results
Troubleshooting
If the generated schedule does not match expectations, start with the troubleshooting guide and then review the constraint-specific articles above.
- Troubleshooting Unexpected Results in MxAPS
- MxAPS: Error Messages and Fixes
- Understanding Why MxAPS Moved My Production Order
- How to Identify Material Shortages in an MxAPS Schedule
- Preventing Lower-Ranked Orders from Filling Schedule Gaps
- Shop Calendar Exceptions
Advanced and Integration Topics
Related Graphical Scheduler Articles
MxAPS calculates and sequences the production schedule. Graphical Scheduler provides the visual scheduling interface used to review production operations and, where permitted, make manual scheduling changes. The following Graphical Scheduler articles are particularly relevant when using the two applications together.
Still need help?
Ask other Business Central users in the Insight Works community, or send the details to the support team. Include the steps you took and any error message you saw.