Work Center Loading for Microsoft Dynamics 365 Business Central

An overloaded work center is easy to miss in a list of routing lines and hard to miss once the orders pile up on the floor. Graphical Scheduler shows current or future load by work center, with colors for utilization thresholds. This is a completely free app from Insight Works for Business Central.

Planners see which days are over capacity while there is still time to move work.

How Work center loading works in Graphical Scheduler

  1. The planner opens the work center loading view, or reads the load rows on the main schedule.
  2. Colors show which work centers are over or under their thresholds on each day.
  3. The planner checks the utilization and available capacity for the overloaded days.
  4. The planner moves operations with drag and drop to days or work centers with capacity, then reviews the load again.
Video thumbnail: Show work center load and calendars in Graphical Scheduler
Show work center load and calendars in Graphical Scheduler For production planners who want to see capacity and shift times on the same screen as the operations they schedule. Transcript and details →

Key capabilities

Load by day

The work center loading view shows each work center's utilization percentage and available capacity by day.

Colors for thresholds

Utilization is colored against thresholds, so overloaded and underused days stand out without reading every number.

Load on the main schedule

The default schedule shows a color-coded load row above each work center group, so load is visible while moving operations.

Filter by status

Work center load can be filtered by production order status, for example to leave completed orders out of the capacity picture.

Standard styles

Default load styles keep the colors consistent from one load view to the next.

See Work center loading on screen

Real screens from Graphical Scheduler, shown with demo data.

Details that matter on the floor

Load next to the shifts

Graphical Scheduler's calendar integration shows capacity load alongside shift start and end times from the work center calendars, so load is read against the hours the shop actually works.

It shows load; you decide

The view shows where the overload is. Moving the work is a planning decision, made by dragging operations on the schedule.

Who uses Work center loading

Operations managers

See capacity and load across work centers to decide on overtime or shifting work.

Production planners

Find overloaded days and move operations before they become late.

Manufacturing and production analysts

Review utilization patterns to find recurring bottlenecks.

Questions about Work center loading

Can Business Central show work center load visually?

Yes, with Graphical Scheduler. Its work center loading view shows utilization percentage and available capacity by work center and day, colored by utilization thresholds.

Does it show future load?

Yes. The view shows current or future load, based on the operations scheduled on each work center.

Can I leave finished orders out of the load?

Yes. Work center load can be filtered by production order status.

Does Graphical Scheduler level the load for me?

No. It shows the load so a planner can move work. Automated scheduling against finite capacity is what MxAPS, Insight Works' finite capacity scheduling app, does.

Graphical Scheduler app icon

Part of Graphical Scheduler

Visualize each workstation, enabling managers & staff to manage production scheduling more effectively.

Have a question about Work center loading?

Send us a note and the Graphical Scheduler team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.

Ask a product question

Product Questions