A schedule that ignores shifts invites a planner to drop work into lunch breaks, weekends, or a second shift that does not run. Graphical Scheduler reads the work center calendars in Business Central and shows shift start and end times, breaks, and non-working time on the schedule. This is a completely free app from Insight Works for Business Central.

How Work center calendar integration works in Graphical Scheduler

  1. Work center calendars, shifts, and breaks are maintained in Business Central.
  2. Graphical Scheduler reads those calendars for the work centers in the view.
  3. Shift times, breaks, and non-working time appear on the schedule.
  4. The planner places or moves operations within working time, and opens the work center calendar from an operation when a shift needs checking.
Video thumbnail: Show work center load and calendars in Graphical Scheduler
Show work center load and calendars in Graphical Scheduler For production planners who want to see capacity and shift times on the same screen as the operations they schedule. Transcript and details →

Key capabilities

Shifts from Business Central

Shift start and end times come from the work center calendars already set up in Business Central, so the schedule and the calendar agree.

Breaks and pauses

Daily pauses such as lunch and other breaks are blocked out on the schedule, so it is clear when a machine center is not staffed.

Highlight or hide non-working time

Non-working hours can be highlighted or hidden, either to keep them visible as a warning or to give working time more room on screen.

Working hours display

How working hours appear in time-based views is configurable, so the display matches the times the shop actually works.

Load in context

Capacity load shows alongside the shifts, which ties in with the work center loading view.

Details that matter on the floor

Visual cue, Business Central rules

The calendar display helps a planner avoid unavailable time. When an operation is dragged, Business Central still applies its own calendar logic and can refuse a move into time with no capacity.

One calendar to maintain

Because shifts come from the Business Central work center calendars, there is no separate shift setup in the scheduler to keep in step.

Who uses Work center calendar integration

Production planners

Place operations within real shift times and see breaks before moving work.

Operations managers

Review shift availability alongside load when deciding on overtime or extra shifts.

Shop floor coordinators

Check which shifts are running when planning the day.

Questions about Work center calendar integration

Does Graphical Scheduler show shifts and breaks?

Yes. It reads Business Central work center calendars and shows shift start and end times, breaks, and non-working time on the schedule.

Can I hide non-working hours?

Yes. Non-working hours can be highlighted or hidden, and the working hours display is configurable.

Where do I change a shift?

In the Business Central work center calendar. Graphical Scheduler shows what the calendar holds, and you can open the work center calendar from an operation.

Graphical Scheduler app icon

Part of Graphical Scheduler

Visualize each workstation, enabling managers & staff to manage production scheduling more effectively.