Skip to content
Graphical Scheduler app iconGraphical SchedulerScheduling

Visual Production Schedule for Microsoft Dynamics 365 Business Central

Production order routing lines in Business Central are dates in a list, so a planner has to open order after order to see what each work center is running and when. Graphical Scheduler draws those operations as blocks on a timeline, organized by work center group, work center, and machine center. This is a completely free app from Insight Works for Business Central.

The schedule reads the routing lines Business Central already holds, so there is no second system to keep in step.

How Visual production schedule works in Graphical Scheduler

  1. Production orders are created and released in Business Central, with routings on work centers and machine centers.
  2. The planner opens Graphical Scheduler, which shows the default view of released production orders.
  3. Operations appear as blocks on the rows of their work centers and machine centers, with time across the top.
  4. The planner scans the load row above each work center group for busy periods and hovers over a block for its details.
  5. Where a date or resource needs to change, the planner drags the block or opens the production order from the schedule.

Key capabilities

A resource tree down the left

Work center groups, work centers, and machine centers are listed in a hierarchy on the left side of the schedule, with time across the top. Each operation sits on the row of the resource it is routed to.

Operations as blocks

Each production order operation is drawn as a block from its starting to its ending date and time. The block length shows how long the operation runs, so overlaps and gaps are visible at a glance.

Load above each group

A color-coded load row sits above each work center group, so the planner sees busy and quiet periods before opening any detail. See work center loading for the dedicated load view.

Tooltips and labels you choose

Cell text and tooltips come from templates in the view, so a block can show the order number, operation, item, or other fields from the routing line.

One place to act

From the same schedule, a planner can drag an operation to a new time or machine, open its details, or change the production order status.

No second system

Graphical Scheduler works directly on Business Central data. There is no export, import, or nightly sync, so the schedule reflects the routing lines as they stand.

See Visual production schedule on screen

Real screens from Graphical Scheduler, shown with demo data.

Details that matter on the floor

It shows what Business Central already says

Graphical Scheduler does not replace Business Central scheduling. It shows the dates Business Central has calculated, so the picture on screen and the routing lines always agree.

It is deliberately visual, not automatic

The schedule shows load and timing so a person can decide what to move. It does not sequence orders or level load on its own; that is the job of MxAPS, Insight Works' finite capacity scheduling app.

Who uses Visual production schedule

Production planners

See production flow across every work center and adjust dates where the schedule does not work.

Operations managers

Get a high-level view of shifts, capacity, and work center load to inform resource decisions.

Shop floor coordinators

Check what is running next on each machine center as daily conditions change.

Questions about Visual production schedule

Can Business Central show production orders on a Gantt chart?

Yes, with Graphical Scheduler. It shows production order operations on a Gantt-style timeline organized by work center group, work center, and machine center, inside Business Central.

Where does the schedule get its dates?

From production order routing lines in Business Central. Graphical Scheduler draws each operation from its starting to its ending date and time, so it shows the same dates Business Central holds.

Does Graphical Scheduler optimize the schedule?

No. Graphical Scheduler shows the schedule and lets a person change it. Automated sequencing against finite capacity is what MxAPS does, and MxAPS results can be shown in Graphical Scheduler.

What needs to be set up first?

Work centers, machine centers, and routings must already be set up in Business Central. The setup wizard then creates a working default view of released production orders.

Who can use the visual schedule?

Users need a Business Central license, and licensing depends on your setup. See the licensing FAQ for details.

Graphical Scheduler app icon

Part of Graphical Scheduler

Visualize each workstation, enabling managers & staff to manage production scheduling more effectively.

Have a question about Visual production schedule?

Send us a note and the Graphical Scheduler team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.

Ask a product question

Product Questions