Start From the Production BOM for Microsoft Dynamics 365 Business Central
A second- or third-level production bill of materials (BOM) often has no item attached, so a view that starts from an item cannot reach it. Multi-Level BOM Viewer starts from the production BOM number instead, so any production BOM in Business Central can be opened and analyzed, with or without an item.
The hierarchy, availability, and editing tools work the same way whichever BOM you start from.
How Start from the production BOM works in Multi-Level BOM Viewer
- Open Multi-Level BOM Viewer and enter the production BOM number of the product or subassembly you want to check.
- Set a quantity, location code, and date filter if you want availability for a specific build.
- Multi-Level BOM Viewer retrieves the BOM's lines and every level beneath them.
- Work through the lines, open the diagram, or edit a line, the same as for any other BOM.
Key capabilities
The production BOM number as the entry point
Enter a production BOM number in the header and Multi-Level BOM Viewer retrieves its lines. No item number is needed to start.
Lower-level BOMs in scope
A subassembly that exists only as a production BOM, with no item attached, opens the same way as a finished product. Planners can check it without tracing a parent item first.
A subassembly at its own quantity
Enter a quantity for the subassembly itself to see its component requirements and availability, separately from the product it feeds.
The same tools at every level
From a lower-level BOM, the multi-level hierarchy, shortage visibility, and line editing work exactly as they do from a top-level BOM.
Details that matter on the floor
Room for intermediate structures
Many manufacturers keep intermediate production BOMs that are never stocked as items. Starting from the production BOM keeps those structures within reach for planning and maintenance.
Who uses Start from the production BOM
Production planners
Check a subassembly's components and availability on their own, before a parent order needs it.
Manufacturing engineers
Open and maintain intermediate production BOMs that have no item of their own.
Questions about Start from the production BOM
Can I view a production BOM that has no item attached?
Yes. Multi-Level BOM Viewer starts from the production BOM number, so a production BOM with no item attached opens and expands the same way as any other.
What do I need to enter to open a BOM?
Only the production BOM number. Quantity, date filter, location code, item display, and demand calculation are optional settings that shape the availability figures.
Can I check a subassembly without opening the finished product?
Yes. Enter the subassembly's own production BOM number, and Multi-Level BOM Viewer shows its levels, quantities, and availability on their own.
Related Multi-Level BOM Viewer features
All Multi-Level BOM Viewer features →Part of Multi-Level BOM Viewer
Easily visualize and edit complex BOM hierarchies for streamlined operations.
Have a question about Start from the production BOM?
Send us a note and the Multi-Level BOM Viewer team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.