BOM Shortage Visibility for Microsoft Dynamics 365 Business Central

A shortage two or three levels down in a bill of materials (BOM) can stop a build as surely as a missing top-level part, but it rarely shows until someone goes looking. Multi-Level BOM Viewer shows availability on every line of the production BOM hierarchy in Business Central, so a short component surfaces wherever it sits.

Shortages show as negative availability in red, in the table and on the nodes of the diagram.

How BOM shortage visibility works in Multi-Level BOM Viewer

  1. Open the production BOM in Multi-Level BOM Viewer and enter the quantity you plan to build.
  2. Set a location code and date filter for the site and period.
  3. Scan the availability column for negative values in red on any level.
  4. Expand subassemblies or open the diagram to see where in the structure each shortage sits.
  5. Check supply on order for the short component and act through purchasing or planning.

Key capabilities

Every level checked

Availability is calculated for the components of lower-level production BOMs as well as for top-level lines, so a short part inside a subassembly is not hidden by its parent.

Red negative values

A component that cannot cover its requirement shows a negative availability in red, which makes a long list quick to scan.

Shortages in the diagram

In Diagram View, the availability on each node shows in red where it falls short, so the shortage appears at its place in the product structure.

Tied to your build

Shortages are calculated against the output quantity, location, and date filter in the header. See Feasibility by Quantity.

Supply in the same view

Supply columns on the same row show what is already on order for the short component, so the next question is answered on the same page.

See BOM shortage visibility on screen

Real screens from Multi-Level BOM Viewer, shown with demo data.

Details that matter on the floor

Shortages where they start

Because each level is checked, a shortage appears on the component that causes it, not only as a problem with the finished product.

Good inputs, good answers

Availability depends on the location and date setup behind it. Accurate location codes and dates in Business Central give a more reliable shortage list.

Who uses BOM shortage visibility

Production planners

Find every short component for a build, at any depth, before releasing it.

Purchasing managers

See exactly which purchased parts are short and act on them first.

Quality assurance teams

Confirm the specified materials are available before production starts, so substitutions are not made under pressure.

Questions about BOM shortage visibility

Can Business Central show component shortages across all BOM levels?

Yes, with Multi-Level BOM Viewer. Multi-Level BOM Viewer calculates availability on every line of a production BOM, including lower-level BOMs, and shows shortages as negative values in red.

How are shortages shown?

As negative availability in red, on the line in the table and on the node in the diagram.

Does Multi-Level BOM Viewer resolve shortages?

No. Multi-Level BOM Viewer shows them. To create purchase or production suggestions, use a planning tool such as Enhanced Planning Worksheet, part of the Enhanced Planning Pack.

Multi-Level BOM Viewer app icon

Part of Multi-Level BOM Viewer

Easily visualize and edit complex BOM hierarchies for streamlined operations.