Skip to content
Multi-Level BOM Viewer app iconMulti-Level BOM ViewerAvailability

BOM Feasibility by Quantity for Microsoft Dynamics 365 Business Central

Before promising a build, a planner needs to know whether there is enough material for the quantity being asked for, at every level of the bill of materials (BOM). In Multi-Level BOM Viewer, the planner enters an output quantity in the page header, and component requirements and availability in Business Central are calculated against that quantity on every line.

The result shows which components fall short for that build before anyone commits to it.

How BOM feasibility by quantity works in Multi-Level BOM Viewer

  1. Open the production BOM in Multi-Level BOM Viewer.
  2. Enter the output quantity you want to check in the Quantity field.
  3. Set Demand Calculation to Include Page Quantity, and set a location code and date filter if needed.
  4. Read requirements and availability on each line; negative availability in red marks a shortage.
  5. Adjust the quantity, or act on the short components through purchasing or planning.

Key capabilities

The quantity is the test

The Quantity field in the header sets the output you want to check. Multi-Level BOM Viewer calculates component requirements and availability projections against it.

Include the build in demand

Set Demand Calculation to Include Page Quantity and the entered quantity is folded into component demand, so availability reflects the build you are considering.

Shortages as negative availability

Where a component cannot cover the requirement, availability shows as a negative value in red. Shortage Visibility explains how shortages appear across levels.

Matched to a site and window

Combine the quantity with a location code and date filter so the answer reflects the site and period you are planning for. See Location and Date Filters.

Try another quantity

Change the quantity and the requirements change with it, which lets a planner test different build sizes against the material on hand and on order.

See BOM feasibility by quantity on screen

Real screens from Multi-Level BOM Viewer, shown with demo data.

Details that matter on the floor

The settings are part of the result

Quantity, date filter, location code, and demand calculation all change the figures. Two planners with different header settings will see different answers for the same BOM, so share the settings with the result.

A check, not a plan

Multi-Level BOM Viewer shows what is short. Turning that into purchase or production suggestions is the job of Enhanced Planning Worksheet, another app in the Enhanced Planning Pack.

Who uses BOM feasibility by quantity

Production planners

Check whether a requested quantity can be built before confirming a date or releasing an order.

Purchasing managers

See which purchased components are short for a planned build before placing orders.

Inventory and materials managers

Confirm stock will cover what a planned build will consume.

Questions about BOM feasibility by quantity

Can Business Central check whether I have enough components to build a quantity?

Yes, with Multi-Level BOM Viewer. Enter the output quantity in the header, and Multi-Level BOM Viewer calculates component requirements and availability against it on every level of the production BOM, with shortages shown as negative values in red.

Does the check count demand that already exists?

Multi-Level BOM Viewer shows demand from documents such as sales orders beside supply on each line, and setting Demand Calculation to Include Page Quantity adds the quantity you entered to that demand.

Does Multi-Level BOM Viewer create purchase or production orders?

No. Multi-Level BOM Viewer reports what is short. Planning suggestions come from a planning tool such as Enhanced Planning Worksheet.

Can I check a quantity for one location only?

Yes. Enter a location code in the header, and availability is calculated for that location.

Multi-Level BOM Viewer app icon

Part of Multi-Level BOM Viewer

Easily visualize and edit complex BOM hierarchies for streamlined operations.

Have a question about BOM feasibility by quantity?

Send us a note and the Multi-Level BOM Viewer team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.

Ask a product question

Product Questions