BOM Availability by Location and Date for Microsoft Dynamics 365 Business Central
Component availability for the whole company over all dates rarely matches the question a planner is asking, which is usually about one plant and a specific period. Multi-Level BOM Viewer filters bill of materials (BOM) availability by location code and date range in Business Central, so the shortage answer reflects a real replenishment window.
The filters sit in the page header and apply to every level of the hierarchy.
How BOM availability by location and date works in Multi-Level BOM Viewer
- Open the production BOM in Multi-Level BOM Viewer.
- Enter the location code for the site you are planning.
- Set the date filter for the period the build depends on.
- Enter the output quantity, if you are checking a specific build.
- Read supply, demand, and availability on each line, and adjust the window if needed.
Key capabilities
One site at a time
Enter a location code so supply, demand, and availability come from that location only. A manufacturer with several sites checks the one where the build will happen.
A real window
A date filter limits the supply and demand figures to the period you set, so the answer reflects what is due within that window rather than a snapshot.
With the build quantity
The filters work together with the output quantity in the header, so one check answers whether this site can build this quantity in this period. See Feasibility by Quantity.
Part of the result
Changing the location or date changes availability on every line. Note the filters with any result you share, so others read it the same way.
Details that matter on the floor
Matches how replenishment works
Purchasing and production happen against dates and sites. Filtering by both keeps a shortage list aligned with the supply that can actually arrive in time.
Who uses BOM availability by location and date
Production planners
Check availability for the plant and period of a planned build.
Purchasing managers
See shortages within the lead time window they can still act on.
Inventory and materials managers
Review component position at one location without other sites' stock in the figures.
Questions about BOM availability by location and date
Can I check BOM availability for one location?
Yes. Enter a location code in the Multi-Level BOM Viewer header, and supply, demand, and availability are shown for that location.
Can I limit availability to a date range?
Yes. Set the Date Filter in the header to the period you are planning for.
Do the filters apply to lower levels of the BOM?
Yes. Every line of the hierarchy uses the filters in the header.
Related Multi-Level BOM Viewer features
All Multi-Level BOM Viewer features →Part of Multi-Level BOM Viewer
Easily visualize and edit complex BOM hierarchies for streamlined operations.
Have a question about BOM availability by location and date?
Send us a note and the Multi-Level BOM Viewer team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.