Convert Components to Phantom or Production BOMs for Microsoft Dynamics 365 Business Central
Sometimes a component no longer justifies being maintained as an item, and the structure of the product has to change around it. Multi-Level BOM Viewer lets a planner turn a component into a phantom bill of materials (BOM), a set of components passed through to the parent rather than stocked on its own, or into a production BOM, from within the view in Business Central.
The conversion is a change to the line's type, made from the same Edit Line dialog used for other corrections.
How Convert components to phantom or production BOMs works in Multi-Level BOM Viewer
- Open the production BOM in Multi-Level BOM Viewer.
- Select the component line and choose Edit Line.
- Change the Type to production BOM and select the phantom or production BOM number the line should use.
- Choose OK to save the change.
- Review the line in the hierarchy and open its card if you need to check the BOM behind it.
Key capabilities
Change the type on the line
In the Edit Prod. BOM Line dialog, the Type field sets whether the line is an item or a production BOM. Select the new type and number to restructure the line.
Phantom or production BOM
A component can become a phantom or production BOM from within the view, when maintaining it as an item stops making sense.
Decide where you see it
The conversion happens while the planner reads the hierarchy, so the structural decision is made when the reason for it is on screen.
Check the result
After the change, Show Card on the converted line opens its production BOM card. See Drill-Through.
See Convert components to phantom or production BOMs on screen
Real screens from Multi-Level BOM Viewer, shown with demo data.
Details that matter on the floor
The result lives in standard records
The change is made on the production BOM line, so the restructured product is held in Business Central's own production BOM records.
Part of line editing
Conversion uses the same dialog as Edit BOM Lines in Place, so there is nothing new for a planner to learn.
Who uses Convert components to phantom or production BOMs
Manufacturing engineers
Restructure a product when a component should become a phantom or subassembly.
Production planners
Act on a structural problem found while checking a build, without leaving the check.
Questions about Convert components to phantom or production BOMs
Can I convert a component to a phantom BOM in Business Central?
Yes, with Multi-Level BOM Viewer. Edit the line from the view and change its type, so the component becomes a phantom or production BOM.
Do I have to open the parent BOM to make the change?
No. The change is made from the line in Multi-Level BOM Viewer.
Can Multi-Level BOM Viewer build new BOMs from rules?
No. Multi-Level BOM Viewer works with production BOMs that already exist. BOMs that Product Configurator creates can be viewed and edited here like any other production BOM. Rules-driven BOM and routing creation is the job of Product Configurator, a separate Insight Works app.
Related Multi-Level BOM Viewer features
All Multi-Level BOM Viewer features →Part of Multi-Level BOM Viewer
Easily visualize and edit complex BOM hierarchies for streamlined operations.
Have a question about Convert components to phantom or production BOMs?
Send us a note and the Multi-Level BOM Viewer team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.