Edit BOM Lines in Place for Microsoft Dynamics 365 Business Central

Planners often find a wrong quantity or unit of measure while reading a bill of materials (BOM), and then have to stop and open the right BOM to fix it. Multi-Level BOM Viewer lets them edit the line from the viewer in Business Central: type, number, description, quantity per, unit of measure, routing link, and position.

The change is made on the production BOM line itself, at the moment the problem is found.

How Edit BOM lines in place works in Multi-Level BOM Viewer

  1. Open the production BOM in Multi-Level BOM Viewer and find the line to correct.
  2. Select the line and choose Edit Line, or select its node in the diagram.
  3. Change type, number, description, quantity per, unit of measure code, routing link code, or position.
  4. Choose OK to save the change to the production BOM line.
  5. Continue through the hierarchy and correct the next line the same way.

Key capabilities

Edit from the line

Select a line and choose Edit Line. The Edit Prod. BOM Line dialog opens with the line's current values.

The fields that change most

Type, No., Description, Quantity per, Unit of Measure Code, Routing Link Code, and Position can all be changed in the dialog.

Certified BOMs

Lines on a certified production BOM can be edited in place from Multi-Level BOM Viewer, and each change leaves an audit record.

From the diagram too

Selecting a node in Diagram View opens the same line for editing.

Change the line type

Changing the type is how a component becomes a phantom or production BOM. See Convert Components.

More fields by extension

A developer or partner can add fields to the editable set. See Extensible Field Set.

See Edit BOM lines in place on screen

Real screens from Multi-Level BOM Viewer, shown with demo data.

Details that matter on the floor

Fix it where you find it

The planner who spots the error makes the correction from the same screen, with the parent subassembly and availability still in view.

A change control decision

Because lines can be changed from this screen even when the production BOM is certified, a business with formal engineering change control should agree who makes BOM changes from the viewer.

Who uses Edit BOM lines in place

Manufacturing engineers

Correct quantities, units of measure, routing links, and positions while reviewing a product structure.

Production planners

Fix a BOM line found during an availability check without leaving the check.

Questions about Edit BOM lines in place

Can I edit production BOM lines without opening each BOM?

Yes. In Multi-Level BOM Viewer, select a line on any level and choose Edit Line to change it from the viewer.

Which fields can I change?

Type, No., Description, Quantity per, Unit of Measure Code, Routing Link Code, and Position. A developer or partner can extend the set.

Can I edit a certified production BOM?

Yes. Lines on a certified production BOM can be edited in place from Multi-Level BOM Viewer, and each change leaves an audit record. If your business uses formal change control, agree who makes BOM changes from the viewer.

Multi-Level BOM Viewer app icon

Part of Multi-Level BOM Viewer

Easily visualize and edit complex BOM hierarchies for streamlined operations.

Have a question about Edit BOM lines in place?

Send us a note and the Multi-Level BOM Viewer team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.

Ask a product question

Product Questions