- This topic has 1 reply, 2 voices, and was last updated 5 months ago by Terri V..
Viewing 2 posts – 1 through 2 (of 2 total)
-
AuthorPosts
-
19 June 2026 at 7:18 am #8968SJShripal J.
- Does SFI support Work Center-level and Machine Center-level time tracking, or is time recorded only against production operations and employees?
- If operators use SFI Clock In/Clock Out functionality, how are the recorded hours transferred to Business Central?
- When calculating Production Order costs, does SFI update the actual run time and setup time used by Business Central, or does Business Central continue to use the routing standard times?
- If the actual time recorded in SFI differs from the routing standard time (for example, standard run time = 1 hour, actual run time = 45 minutes), which value is used for:
<ul data-spread=”false”> - Capacity Ledger Entries
- Production Order costing
- Work Center/Machine Center utilization reporting
- Are there any recommended best practices for using SFI time tracking together with Business Central flushing methods (Manual, Forward, Backward)?
Any guidance, documentation, or examples would be greatly appreciated.
22 June 2026 at 8:51 am #10850TVTerri V.Insight WorksHello Shripal,
Hello,
The Shop Floor Insight application allows users (SF employee records) to track time against released production order routing lines. This functions with a web application; the SF web client. Users use a barcode scanner to scan their employee badge from a scanning station and this will create a time card for the day. Then, they can clock ON released production order routing lines by using a barcode (job card report) or the Production Dispatch list in the SF web client.
A few more comments:
- All of the information lives in BC, the SF web client is just a “front-end” to create time cards and track actual labour time (among other things such as consumption, output and more).
- The Time card line will indicate the BC Work Center and if applicable, the BC Machine center as well.
- In most situations, the time cards are for 1 SF employee record and are for 1 day (1 shift).
- The time cards then need to be reviewed and approved, and once they have been approved these can be posted.
- Once the time cards are posted, this is when you will be “posting” time to the referenced released production orders.
- The expected setup / run-times visible on the released production order routing lines are the “expected” or “estimated” amount of labour time. This is important in production planning and production scheduling, but cusotmers that have Shop Floor Insight are tracking actual labour time instead. (meaning whatever time tracked on the time card lines).
- When you post time to a released production order routing line, this will create capacity ledger entries for the released production order in question.
- Costing, or impact of posting time to a released production order will rely on base BC configuration, meaning via the BC WC and BC MC visible on the TC line, and the costing configuration on the WC/MC.
- There are ways you can see the impact of tracking time, either by analyzing the CLE, or the posted time card lines.
- Some reports come with Shop Floor Insight, however most of these (if not all) are reporting on data collected which comes down to the time cards and the TC lines on them.
- If you are flushing time – then, the use of the SF web client is not for time, but usually for consumption and/or output.
- If you are flushing components (for consumption), then you want to prevent consumption from the SF web client.
- If you are flushing output, then you want to prevent output from the SF web client.
- There is a lot of information available in the KB site: https://kb.dmsiworks.com/knowledge-base/release-notes-shop-floor-insight/ see the menus on the left.
Thank you,
-
AuthorPosts
Viewing 2 posts – 1 through 2 (of 2 total)
- Sign in below to reply.