Graphical Scheduler

When moving from work centre to machine centre the description is lost

Viewing 3 posts – 1 through 3 (of 3 total)
  • Author
    Posts
  • #8515
    Angela F.

    Hello,

     

    Our routings use the work centres (Department). The idea is that we would then move the routing lines to the machine centres (people) in the graphical scheduler. The issue that I am experiencing is that the description from the routing is lost, it reverts to the Work centre name. Is there a way that I can prevent this from happening?

    #9980
    Terri V.
    Insight Works

    Hello Angela,

    The Graphical Scheduler is a tool to visualize data in Business Central, and this includes the production order routing lines. When you move a routing line in the GS with the default view, and change the assigned WC say from Work Center A to Machine Center A.1, this is exactly the same process if you were to manually change the WC/MC of that routing line of the released production order in BC directly.

    If you do this on the released production order routing line (and not via the GS), you will notice that BC will automatically update the operation of the routing line to the description of the WC/MC that you selected. This is the base normal behaviour of BC.

    I do think this could surely be modified in BC with a BC mod, unrelated to the Graphical Scheduler.

    Since the GS is simply “visualizing” what is happening in BC, if you were to bring a modification where any change to the assigned WC/MC of a routing line would retain the original description of the routing line instead of getting the description of the new WC/MC, you would also see this in the GS.

    This is something the BC partner should be able to do.

    Thank you,

    #9987
    Angela F.

    Thank you, that makes sense.