Skip to content

Graphical Scheduler

Showing Job Data

Viewing 2 posts – 1 through 2 (of 2 total)
  • Author
    Posts
  • #7998
    Karen P.
    Insight Works

    Does this only show production data, or can I also show my job data on it?

    #9052
    Brian N.
    Insight Works

    Version 1.3 which should be hitting appsource soon has an experimental feature to show job planning lines.

    You’re welcome to experiment with it when you’re on 1.3 and provide feedback. Feedback can be send to su*****@*******ks.com, with the subject line “Graphical Scheduler Experimental Feature Feedback”.

    To see job data:

    1. Make sure you’re on version 1.3, this ability won’t exist in older versions.
    2. Navigate to Graphical Scheduler Setup.
    3. In the ‘advanced’ section click “I understand”, this should enable a section called ‘Experimental Features’
    4. In the ‘experimental features’ section, click ‘Show more’.
    5. Change the Experimental features setting from “Disable Experimental Features” to “Enable Experimental Features”.
    6. Save the changes.
    7. Navigate to the Graphical Scheduler.
    8. Click on the ‘View’ action.
    9. Edit your current view.
    10. Click ‘Add Datasource’.
    11. You should now see an option called “Experimental – Job Planning Lines”.
Viewing 2 posts – 1 through 2 (of 2 total)
  • Sign in below to reply.