    Hello!

     

    When I try and run the scheduler it says that there is no starting time or end time, and that all of the production orders are considered unscheduled orders. I’ve run the scheduler many times but this is the first time I’ve seen this.

     

    Can someone explain why?

    #10387
    Terri V.
    Insight Works

    Hello Lindsay,

    If a production order is unscheduled, that means not all operations had enough capacity on the work/machine centers, or the required secondary constraints (e.g. component inventory).

    To better assist please submit a ticket to su*****@*******ks.com. Provide as much detail as you can, a troubleshooting xml, or scheduling a meeting with us to review your system.

    Thank you,

    #10388
    Lindsay H.

    Good morning,

    We figured it out! It was that one of the work centers didn’t have a calendar code/a generated calendar. It must have been missed during setup.

    Thank you for the quick response 🙂