Automated Rescheduling from Shop Floor Activity

  • This topic has 1 reply, 2 voices, and was last updated 7 months ago by Terri V..
Viewing 2 posts – 1 through 2 (of 2 total)
  • Author
    Posts
  • #8928
    Barrett A.

    We have a client who currently uses a scheduling product that generates a new production schedule based on Shop Floor Activity such as labor posting and/or quantity output.  So, the scheduling tool identifies the progress on the production order, calculates the remaining time and reschedules the End Date of the production order.  They are a finite capacity environment, so it also reschedules the succeeding orders as a result.  This product is not integrated with their ERP, so they have to feed it the orders and the operators post their progress outside the ERP as well.

    Moving into BC they want to make sure MxAPS has this capability.  They also don’t want to have to manually run it, so they want to be able to schedule a job that will perform this Shop Floor status update and update the End Dates on all of the BC Production Orders affected.

    Can MxAPS do this?

    #10766
    Terri V.
    Insight Works

    Hello Barrett,

    As MxAPS is built into Business Central each time a schedule is generated, current progress is read to create a new forward schedule based on finite capacity and various possible constraints.

    With the job queue you can generate schedules with MxAPS overnight and auto commit the results, which will update the Start/End Date/Times on the Production Order Lines and Production Order Routing Lines.

    Thank you,