Delays and costing errors usually start with a few operations whose standards no longer match the floor, but in a long list of routing operations they are easy to miss. Routing Analysis puts the average difference, percentage difference, and standard deviation for every operation side by side in Business Central, so the operations furthest from standard stand out.

Threshold filters and the Only Difference display then narrow the list to the ones worth acting on.

How Find the operations out of line works in Routing Analysis

  1. Generate Routing Analysis for a routing and date range.
  2. Set thresholds or choose Only Difference to hide operations close to standard.
  3. Compare percentage difference and standard deviation across the remaining operations.
  4. Open the explanation for an operation to check the figures behind it.
  5. Correct the standard, or investigate the operation on the floor.

Key capabilities

Two signals on one line

An operation can be off because it runs long or short on average, or because it varies widely. Routing Analysis shows both, so neither kind of problem is missed.

Narrow to what matters

Variance Threshold Filters set a minimum average variance and standard deviation, and Only Difference Display hides operations that match the routing.

Why it matters downstream

Routing times drive costing and scheduling. An operation expected to take an hour that really takes fifteen minutes distorts both.

From finding to fixing

Once an operation is identified, change its time on the same line. See Edit Routing Times in Place.

Details that matter on the floor

Variance and variability together

An operation that averages close to standard but swings widely needs attention as much as one that runs consistently long. Seeing both on one line keeps attention on the real outliers.

Who uses Find the operations out of line

Manufacturing engineers

Find the routing operations whose standards no longer reflect the floor.

Operations managers

Identify the operations most likely to cause delays.

Production managers

Focus improvement work where recorded times differ most from plan.

Questions about Find the operations out of line

How do I find which routing operations are off standard in Business Central?

Use Routing Analysis. Generate it for a routing and date range, and each operation shows its average difference, percentage difference, and standard deviation. Threshold filters and Only Difference hide the operations close to standard.

Does Routing Analysis identify bottlenecks?

Routing Analysis shows which operations differ most from their standard times, which is where delays often start. It does not schedule work or model capacity.

What do I do once I find an operation out of line?

Check the figures behind it, then either correct the routing time from the same line or take the finding to the shop floor if the process itself needs attention.

Routing Analysis app icon

Part of Routing Analysis

Optimize production with routing analysis to reduce variability and enhance costing accuracy.

Have a question about Find the operations out of line?

Send us a note and the Routing Analysis team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.

Ask a product question

Product Questions