Skip to content
Production Order Analysis app iconProduction Order AnalysisFeature

Cost at Each Stage for Microsoft Dynamics 365 Business Central

When an order goes over budget, the next question is where: which component, or which work center. Production Order Analysis shows expected and actual cost for each component and each work center on a production order in Business Central, with the variance for each.

A work center is a resource on the routing, such as a machine or a team, so its line shows the cost of time spent there.

How Cost at each stage works in Production Order Analysis

  1. Open Production Order Analysis for the production order.
  2. Check the total variance by cost type.
  3. Find the component or work center lines with the largest variances.
  4. Print the Expected Costs Summary or Cost Variances Summary if you need to share the detail.
  5. Follow up with purchasing, engineering, or the shop floor, depending on the line.

Key capabilities

Components

Each component line shows its expected material cost, actual material cost, and the variance.

Work centers

Each work center line shows its expected and actual capacity and capacity overhead cost, and the variance.

Expected costs summary

The report's Expected Costs Summary lists expected material, capacity, subcontracting, and capacity overhead cost for each component and work center.

Cost variances summary

The Cost Variances Summary lists material, capacity, subcontracting, and overhead variance for each line, with the order total.

From total to cause

Start from the order total, then find the line that drives the variance. Consumption and Capacity Cost Detail shows the quantities and times behind it.

See Cost at each stage on screen

Real screens from Production Order Analysis, shown with demo data.

Details that matter on the floor

Stage by stage, not only in total

An order total can hide a large overrun at one work center offset by savings on a component. Line-level variances show both.

Who uses Cost at each stage

Cost accountants

Allocate a variance to the component or work center that caused it.

Production managers

See which work centers ran over their expected cost.

Operations managers

Find the stages of production where cost most often departs from plan.

Questions about Cost at each stage

Can I see production cost by work center in Business Central?

Yes, with Production Order Analysis. Each work center on the production order shows its expected cost, actual cost, and variance.

Can I see which components caused a material variance?

Yes. Each component line shows its own expected and actual material cost and the variance.

Can I print the cost by line?

Yes. The Production Order Analysis report includes an Expected Costs Summary and a Cost Variances Summary, listed by component and work center.

Production Order Analysis app icon

Part of Production Order Analysis

Monitor actual vs. expected production costs to optimize budgets and enhance profitability.

Have a question about Cost at each stage?

Send us a note and the Production Order Analysis team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.

Ask a product question

Product Questions