Summary

Quality Inspector gives several ways to assign quality inspection tests and see who has them. The video starts with the built-in views in the role centers and the test list, then picks up an unassigned test, changes the assigned user on a test, and shows a test assigning itself to the inspector who edits it. It covers the quality permissions that control who can be assigned and who can change tests assigned to others. It finishes on the Assign Quality Inspection Tests to Inspectors page, where tests are dragged to a different inspector or a new planned start date.

Key topics

  • Pick up an unassigned test from the test list
  • Change the assigned user directly on a test
  • Set the permissions for assigning tests to others
  • Drag tests to an inspector or a planned start date
Read the transcript

I’m going to review some capabilities to assign and review assignments for quality inspection tests in Quality Inspector. If you’re using a role center for Quality Inspector, we have three: one that’s optimized for phones, another that’s optimized for tablets, and one that’s meant for the normal Business Central desktop client. If you’re using any of these three, then when you log into Business Central you’ll have some views set up right on your role center to help you out: tests that are unassigned, your own tests, open tests assigned to anybody, and things of that nature.

If you’re not using the role center and you’re just starting from the test list directly, there are still views available to you, so you can still see all of the tests that way. You can also assign those tests to yourself. One way of assigning a test to yourself is to go to your unassigned list and find any of these tests. In this case, this is test 132, and nobody is assigned to it, so we can just pick it up. When you pick it up, it assigns it to you, and we’ll see that it removes itself from this list.

If you open up a test, you can also change it directly on the test itself with the assigned user ID. For example, if I wanted to change it so that admin is actually doing the test, I can change it in here. We’re going to notice that we’ve got a permission error, and this is just saying that currently this user doesn’t have permission to change that assignment. The other way we can assign it is to find an unassigned one, open it up, and assign it directly to ourselves. That’s also fine.

As long as you’re not in a view that’s filtering it away from you, the moment you alter a test, as long as you’re a quality inspector in that table, it will automatically assign it to you. For example, if I just change this description and call it “example,” we’ll see that it automatically assigns it to me. So these assignments are fairly straightforward. In the quality permissions, you do need to have the users that you want to assign configured, and you also need the appropriate permission to change tests assigned to others if you want some people to be able to pick up tests that others have assigned.

Above and beyond that, there’s also the ability to assign tests graphically with a graphical scheduler. We’re going to accomplish that with Assign Quality Inspection Tests to Inspectors. When we open this, we see the same users that we saw in our list. We see the unassigned tests on this date, and we can see which ones are assigned to Team Member One and which ones are assigned to admin. You can do two things: you can change who it’s assigned to, and you can change the planned start date.

If there’s no planned start date and the test was just created, you’ll see it show up at the very beginning. As soon as you drag it to a planned start date, that adjusts that field on the test. So let’s change this one to start on Wednesday, and we’ll see that this test is now configured to start on Wednesday. Let’s also drag this other test, 142, and tell it to start next week. So now we’ve got some tests configured to start next week and some tests configured for now.

Similar to everything else you can do inside the graphical scheduler, you’ve still got that same capability, so you could still show your work shifts, or you can show everything on the calendar if you prefer a calendar view of assigned and unassigned tests. And of course you can color code it based on open status or finished status. All of that is just configuration.

If we step back and take a macro view, there are several different ways to assign tests. You can drag and drop with the graphical scheduler, and there’s a handy page for that called Assign Quality Inspection Tests to Inspectors. You can use the pickup tool: choose anything in the unassigned list and pick it up. You can change the assigned user directly on the test itself. And if you change a test, the assigned user gets set automatically.

To see who’s assigned, you’ve got the graphical scheduler views, the views built into the list, and built-in cues in the role centers. So there are several different ways to assign tests and to see unassigned tests, graphically or in a list view, all depending on your role and how you want to work with quality inspection assignments.

Questions about this webcast?