All work related to modifications of Insight Works apps or Business Central is billable, including discovery, design, and development. The process is described below.
Requirements and design phase
Customer-specific data and existing modifications can affect the requirements and design of a modification related to an Insight Works app. This phase begins after the app is installed in a customer system that is representative of the production system, and it is done together with the customer and partner. Insight Works will:
- Work with the customer and partner to document the requirements for the modification (billable)
- Engage the development team to create a technical design (billable)
- Prepare a quote with a cost estimate (not billable)
The average lead time to prepare the design and quote is 1 to 3 weeks.
Development phase
Once you have reviewed and approved the quote and design, development begins. The work includes:
- Development (billable)
- Testing (billable)
- Training (billable)
- Support through user acceptance testing (billable)
- Project management (billable)
- Deployment (billable)
- Additional support after deployment to production (not quoted, but billable)
The consultant or project manager provides an estimate for completing the modification. The average lead time to begin development after approval is 1 to 3 weeks.
Customization impact during upgrades
See Customization impact during upgrades.
Billing
Unless the quote specifies a fixed-price engagement, all time for the activities above is billed as it is incurred.
Third-party integrations
Integrations with third-party systems, APIs, carriers, or external platforms may require coordination with vendors outside Insight Works. Delays, undocumented behavior, API limitations, vendor-side defects, environment instability, changing requirements, or third-party response times can affect timelines, testing, and overall implementation effort. Insight Works is responsible for developing the integration within the agreed scope, but cannot guarantee the behavior, stability, availability, or support responsiveness of third-party systems. Additional investigation, testing, redesign, or support caused by third-party dependencies is billable unless otherwise stated in writing.
Custom report development
For report development, Insight Works follows the standard development process so the report has access to all the required information and logic. Report layouts for base Business Central are expected to be done by the partner. If Insight Works is asked to do report layouts, that work is not quoted and is done on a time and materials (T&M) basis only.