Rework Time Tracking with Root Cause for Microsoft Dynamics 365 Business Central
Formal rework gets its own routing step or production order, but in-process rework usually disappears: a part goes back to the welder, the weld gets redone, and the extra hour hides inside the original operation. Shop Floor Insight lets the operator scan a rework code and a root cause code, so that time is recorded on the same production order operation and flagged as rework.
Because each rework entry carries a cause, the time can later be analyzed by root cause, such as engineering, sales, material, or equipment.
How Rework time tracking with root cause works in Shop Floor Insight
- An operator receives a part back from the next operation for a fix.
- The operator scans their badge, the operation, a rework code, and a root cause code.
- Shop Floor Insight records the time on that operation as rework with the chosen cause.
- The operator scans the next activity when the fix is done, which closes the rework time.
- Supervisors approve the lines, and analysis by root cause shows where rework hours come from.
Key capabilities
Two scans to flag rework
The operator scans a rework barcode and a root cause barcode. Time on that operation is then recorded as rework rather than normal run time.
Your own codes
You create the rework and root cause codes that match your shop, for example a drawing error from engineering or a product sold beyond what the shop can build.
Fair to the operator
Flagging rework means a one-hour job that took two hours because the part came back is not recorded as a slow operator.
Visible on the time card
Rework lines appear on the employee's time card with their activity description, such as Rework – Sales, next to the normal production order lines.
Analysis by cause
Rework lines are time card lines, so reporting and analysis can total rework hours by root cause, by order, or by employee.
See Rework time tracking with root cause on screen
Real screens from Shop Floor Insight, shown with demo data.
Details that matter on the floor
Informal rework becomes visible
Rework that never gets its own routing step or production order still gets recorded, at the moment it happens, without paperwork.
The cost picture changes
An hour of rework also means the hour spent the first time and the hour of other work that did not happen. Recording rework by cause gives the team the number to act on.
Who uses Rework time tracking with root cause
Machine operators
Flag rework and its cause with two scans, so their own time is recorded fairly.
Continuous improvement specialists
Total rework hours by root cause to decide which cause to fix first.
Production managers
See how much labor goes to rework on each order and work center.
Questions about Rework time tracking with root cause
How do I track rework time in Business Central?
With Shop Floor Insight, the operator scans a rework code and a root cause code at the terminal. The time is recorded on the production order operation as rework, with the cause attached, and can be analyzed in Business Central.
Can we define our own root causes?
Yes. You create the rework and root cause codes that fit your operation.
Does this replace formal rework orders?
No. Business Central's own options, such as a new routing step or a separate production order, still apply. Rework codes cover in-process rework that would otherwise go unrecorded.
How do we report on rework?
Analyze time card lines by activity or root cause code in Business Central, Excel, or Power BI.
Related Shop Floor Insight features
All Shop Floor Insight features →Part of Shop Floor Insight
A manufacturing execution system (MES) for barcoded time capture and employee time management.
Have a question about Rework time tracking with root cause?
Send us a note and the Shop Floor Insight team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.