Quality Test Plans for Microsoft Dynamics 365 Business Central
A raw material from one supplier, a mixed batch at one work center, and a finished bicycle before shipment all need different checks. A single generic checklist either misses what matters or asks inspectors to skip half the form.
Quality Inspector lets you keep as many test plans as your process needs. Each plan is a Quality Inspection Template, the entry form, with its own test generation rules, the settings that decide when that form becomes a test and for which records.
How Quality test plans works in Quality Inspector
- Identify the inspections your process needs and the point in the process where each one belongs.
- Create a Quality Inspection Template for each inspection.
- Add one or more test generation rules to each template.
- Filter each rule by vendor, item, item attribute, or work center.
- Choose whether each rule creates tests automatically, on demand, or both.
- Tests appear against the matching records as the work happens.
Key capabilities
A template per check
Create as many quality inspection templates as you have distinct inspections: incoming material, in-process checks, final inspection, or a pre-shipment checklist.
Triggers per template
Each template carries its own generation rules, so the receiving test and the production test for the same item can start at different points in the process.
Filters that target the right records
Narrow a rule to one vendor, one item, items with a given attribute, or one work center. The same template can have several rules, such as one for receiving from a vendor and one for production at a mixer.
Automatic or on demand
Set whether a rule supports automatic test creation, on-demand creation, or both, so some plans run every time and others only when someone asks for them.
Rule wizards
Wizards guide the creation of common generation rules, which shortens setup for each new plan.
See Quality test plans on screen
Real screens from Quality Inspector, shown with demo data.
Details that matter on the floor
The right form shows up
An inspector receiving one vendor's material gets that vendor's test, not a long form that covers every supplier.
Plans change without rework
Adding a new product or supplier usually means adding a rule or a template, not rebuilding the ones already in use.
Who uses Quality test plans
Quality assurance managers
Design the set of test plans and decide which records and process points each one covers.
Production supervisors
Rely on the right in-process check appearing at each work center.
Regulatory compliance officers
Confirm that every product and supplier that needs an inspection is covered by a plan.
Questions about Quality test plans
Can I run different inspections for different products in Business Central?
Yes. Quality Inspector supports any number of Quality Inspection Templates, and each one has test generation rules that filter by item, item attribute, vendor, or work center, so each product gets the inspection meant for it.
Can the same item have a receiving test and a production test?
Yes. Give each template its own rule: one triggered on receiving, one triggered in production. The two tests are created at different points and recorded separately.
Can a test plan run only when someone asks for it?
Yes. A generation rule can be limited to on-demand creation, so the plan is available as a manual or ad hoc test without being created automatically.
Related Quality Inspector features
All Quality Inspector features →Part of Quality Inspector
Streamline your quality control process to reduce rework and maximize customer satisfaction.
Have a question about Quality test plans?
Send us a note and the Quality Inspector team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.
