Rule-Based BOM and Routing Changes for Microsoft Dynamics 365 Business Central
A product with options is rarely one bill of materials with a few substitutions. A choice can add a part, remove another, and add or change a step on the shop floor. Product Configurator lets option choices add or remove bill of materials (BOM) components and routing operations.
The configured item's BOM and routing then reflect what the customer chose, without an engineer editing them for each order.
How Rule-based BOM and routing changes works in Product Configurator
- A product manager sets up the choices that bring components and operations, and the base routing for the item category.
- Rules and choice combinations are added where components or steps depend on several choices.
- A salesperson configures the product on a quote or order.
- Product Configurator builds the BOM and routing from the base structure and the choices made.
- The configured item reaches planning and production with its own BOM and routing.
Key capabilities
Components follow the choices
Each option choice can bring child components with it, and rules or choice combinations can include or exclude materials based on the configuration.
Operations follow the choices
A choice can add an operation to the configured item's routing. An operation on a chosen option overwrites the matching operation in the base routing, so the routing describes the work this product needs.
Values that drive structure
Choices that are not items, such as a wood finish, can still drive the components and labor that finish requires.
Labor that scales
Labor can scale with the configuration. In the demo desk, choosing wooden doors adds an hour plus a tenth of an hour for each door.
Built at creation
These changes are applied when the configured item is created, so the BOM and routing on the item are final and ready for planning.
Details that matter on the floor
The routing matches the product
Because an option's operation replaces the matching base operation, a choice that changes how something is made changes the routing step, not just the parts list.
No hand edits per order
Engineers maintain how choices affect structure once, in setup, instead of editing each order's BOM and routing.
Who uses Rule-based BOM and routing changes
Manufacturing engineers
Define which components and operations each choice brings.
Production planners
Plan from routings that reflect the configured work, not a generic base routing.
Product managers
Keep option choices and their build effects in one place.
Questions about Rule-based BOM and routing changes
Can a configuration option add a step to the routing?
Yes. In Product Configurator, a choice can add an operation to the configured item's routing, and an operation on a chosen option overwrites the matching base operation.
Can an option remove a component from the BOM?
Yes. Rules and choice combinations can include or exclude materials based on the choices made.
Can labor time change with the configuration?
Yes. Operation run times can be calculated from configuration values. See routing run times.
Can a choice change a routing's setup time?
Run time is configurable. Changing setup time requires an extension; your Microsoft Partner can advise.
Related Product Configurator features
All Product Configurator features →Part of Product Configurator
Simplify creating BOMs and routing to make quote and order generation more efficient.
Have a question about Rule-based BOM and routing changes?
Send us a note and the Product Configurator team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.