Maintenance Capacity Link to Work Centers for Microsoft Dynamics 365 Business Central
When maintenance is planned outside the production schedule, a machine can be booked for a rush order at the same hour it is due to be taken down. Maintenance Manager links equipment to a work center or machine center, so a maintenance order uses that resource's capacity like any other order.
Production planning then sees the maintenance as load on the machine, and maintenance orders appear in the production schedule.
How Maintenance capacity link works in Maintenance Manager
- A maintenance administrator links the equipment item to its work center or machine center.
- The maintenance task routing includes the maintenance placeholder and any other resources the work needs.
- When a maintenance order is created, Maintenance Manager swaps the placeholder for the equipment's resource.
- The order's routing time reduces that resource's available capacity.
- Planners see the maintenance order in the production schedule and adjust production or maintenance around it.
Key capabilities
Capacity type and number
On the equipment item card, set the Capacity Type to work center or machine center and choose the resource. One equipment item can also link to a fixed asset.
A routing placeholder
Maintenance task routings use a maintenance placeholder. When the maintenance order is created, Maintenance Manager replaces it with the work center or machine center of the equipment being serviced.
Time blocked on the machine
Because the order routes through the real resource, the maintenance time, for example two hours, reduces that work center's or machine center's available capacity.
Other resources too
A task routing can include other resources, such as a service bay, so their capacity is used as well.
Visible in scheduling
Maintenance orders appear alongside production orders in scheduling tools such as Graphical Scheduler, so planners can move either one. This is a completely free app from Insight Works for Business Central.
Automatic interval updates
Linking equipment to a work center or machine center is also what lets runtime and output count advance from posted production.
See Maintenance capacity link on screen
Real screens from Maintenance Manager, shown with demo data.
Details that matter on the floor
One generic routing, many machines
Because of the placeholder, a single routing serves every machine that gets the same maintenance, and each order lands on the right resource.
Maintenance shows up as load
Production scheduling cannot book work over maintenance without the planner seeing it.
Who uses Maintenance capacity link
Production schedulers
See maintenance as capacity load and plan production around it.
Maintenance planners
Schedule maintenance on the right machine without double booking.
Production supervisors
Know in advance when a machine will be down for maintenance.
Questions about Maintenance capacity link
Can maintenance reduce work center capacity in Business Central?
Yes, with Maintenance Manager. Link the equipment to a work center or machine center, and its maintenance orders route through that resource and use its capacity.
Do I need a separate routing for each machine?
No. A maintenance task routing uses a placeholder that Maintenance Manager replaces with the actual work center or machine center when it creates the order.
Will maintenance show on the production schedule?
Yes. Maintenance orders are production orders, so they appear in scheduling tools alongside production orders.
Does Maintenance Manager schedule maintenance automatically?
No. Maintenance Manager plans when maintenance is due and creates the orders; scheduling is done with your scheduling tools.
Related Maintenance Manager features
All Maintenance Manager features →Part of Maintenance Manager
Streamline maintenance, maximize uptime, and ensure assets last longer.
Have a question about Maintenance capacity link?
Send us a note and the Maintenance Manager team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.