Regenerative Plan for Microsoft Dynamics 365 Business Central
Most companies need more than one kind of planning. Reorder-point replenishment suits stocked items, while manufactured items need date-phased component planning, and switching between worksheets splits a planner's view of the same items.
Enhanced Planning Worksheet runs the standard Business Central regenerative plan, the material requirements planning (MRP) and master production schedule (MPS) calculation, from the same worksheet that runs Calculate Purchase Plan.
How Regenerative Plan works in Enhanced Planning Worksheet
- The planner opens Enhanced Planning Worksheet and chooses Calculate Regenerative Plan on the Prepare tab.
- Business Central calculates the regenerative plan with its standard options and filters.
- The planner reviews the action messages with the worksheet's FactBoxes and tabs.
- Approved lines are carried out as production orders, purchase orders, or transfers in the usual way.
Key capabilities
Standard planning logic
The regenerative plan is Business Central's own MRP and MPS calculation. Enhanced Planning Worksheet runs it as it is, with no change to the planning logic.
Component requirements
For manufactured items, the regenerative plan explodes component requirements. Calculate Purchase Plan works from stockkeeping units and, in the latest release, plans multi-level production orders, so the two runs cover different needs.
Same review tools
Lines from a regenerative plan are reviewed with the Planning Summary, Availability by Location, and the History, Chart, and Planning tabs.
Choose per run
Calculate Regenerative Plan and Calculate Purchase Plan sit side by side on the Prepare tab, so the planner picks the right run for the job.
Details that matter on the floor
Two plans, one screen
Distribution items can be planned with Calculate Purchase Plan and manufactured items with the regenerative plan, while the planner keeps one worksheet and one set of review tools.
Nothing replaced
Because the regenerative plan is the standard calculation, results match what the planner expects from Business Central MRP.
Who uses Regenerative Plan
Production planners
Run date-phased MRP for manufactured items and their components.
Inventory planners
Use the same review tools for regenerative and purchase plan results.
Operations managers
Keep manufacturing and distribution planning in one worksheet.
Questions about Regenerative Plan
Can I run MRP from Enhanced Planning Worksheet?
Yes. Enhanced Planning Worksheet runs the standard Business Central regenerative plan, the MRP and MPS calculation, from the same worksheet.
When should I use the regenerative plan instead of Calculate Purchase Plan?
Use the regenerative plan when dates and dependent demand matter, such as component requirements for manufactured items. Use Calculate Purchase Plan for reorder-point or maximum-quantity replenishment where date-phasing creates more messages than it is worth.
Does Enhanced Planning Worksheet change how the regenerative plan calculates?
No. The regenerative plan is Business Central's own calculation. Enhanced Planning Worksheet adds the summaries, availability, history, and editing tools around its results.
Can I see the full bill of materials for a manufactured item?
Multi-Level BOM Viewer, another Insight Works app in Enhanced Planning Pack, shows every level of a bill of materials (BOM) with supply and demand for each component.
Related Enhanced Planning Worksheet features
All Enhanced Planning Worksheet features →Part of Enhanced Planning Worksheet
Align Inventory with Demand and Optimize Vendor-Driven Purchasing.
Have a question about Regenerative Plan?
Send us a note and the Enhanced Planning Worksheet team will reply by email. Ready to plan a rollout? Contact your Microsoft Partner.