Home › Forums › Feature Requests › Product Configurator Feature Requests › Add the option to launch the IW Product Configurator from the Project Task Card

Viewing 1 post (of 1 total)
  • Author
    Posts
  • JAVIER DIAZGRANADOSJAVIER DIAZGRANADOS
      Post count: 18
      Upvote
      Up
      0
      Down
      Not Helpful
      ::

      <p class=”xmsonormal”><span style=”font-size: 11.0pt;”>The same way, as the Product Configurator is launched from a Sales Quote or a Sales Order… to create Sales Lines with the configurations…. </span></p>
      have the option to be able to launch it from the Project Task Card… to create Planning Lines with the Configured Item.
      <p class=”xmsonormal”>Sabre Limited works with many customers using the Projects module, and some of them would be interested in this capability.</p>

    Viewing 1 post (of 1 total)
    • You must be logged in to reply to this topic.