Home Forums Graphical Scheduler Multiple Views Reply To: Multiple Views

Insight Works
    Post count: 30

    Yes. The trick is to create two different views. To configure:

    1. Start with a new view, and call it ‘Macro’, and then edit the view ( View –> Edit )
    2. Show a scale of ‘Months/Years’.
    3. Add the released production order routing lines datasource.
    4. Save the view as a copy called ‘Immediate’, and edit the view.
    5. In the configuration for the ‘Immediate’ view change the scale, and add in the datasource for work center load, as well as the work shifts.

    To use:

    1. After the graphical scheduler starts click ‘View’.
    2. Choose either the ‘Macro’ view created above, or choose the ‘Immediate’ View.