Production BOM Component Constraint Setup

Skip to main content

Production BOM Component Constraint Setup

You are here:

You must set up the following to ensure the schedule gets constrained:

  • Each of the operations on the routing lines have the “Secondary Constraints” set to “Schedule”.
  • Have the “Constraint Type” set to “Constrain” and “Fence Type” set to “Global” or “Item” on the item card for each of the constraints.
    • If “Fence Type” is set to “Item”, MxAPS uses the item’s defined Lead Time for when the item is automatically replenished.
    • If “Fence Type” is set to “Global”, MxAPS uses the defined “Global Lead Time” which is set when generating a schedule.
    • If you would like no auto replenishment, set one of the following:
      • The “Global Lead Time” value to exceed the “Schedule Duration”.
      • The item “Lead Time” to be greater than the maximum schedule duration of 365 days.
Was this article helpful?
0 out Of 5 Stars
5 Stars 0%
4 Stars 0%
3 Stars 0%
2 Stars 0%
1 Stars 0%
5
How can we improve this article?
Please submit the reason for your vote so that we can improve the article.
Need help?
Tags:

Leave A Comment

Table of Contents
Go to Top