Schedule Result
The MxAPS Schedule Result page contains a record for each schedule production order routing line. The page provides a centralized location to make manual changes to a schedule in preparation for regenerating it.
You can make changes to the schedule by editing the fields listed in the table below. If you make changes, ensure you use the Reschedule action on MxAPS Schedule Result page or the MxAPS Schedule Result List page to regenerate the schedule or the changes do not apply.
Caption | Description |
Class | The class code is part of the default scheduling rule. If it is part of your schedule rule, it provides a quick way to prioritize or de-prioritize orders. |
Priority | If the priority is part of your schedule rule, it provides a quick way to prioritize or de-prioritize orders. |
Order Set No. | Operations with the same order set number are grouped together to run on the same machine if Common Routing Link Code and Common Machine No. in the routing line table also match. |
Moved-To Machine No. | Select a different machine center for the operation to run on. |
Split Quantity | Divides the operation into multiple lots equal to the split size, which creates the possibility for scheduling the operation on multiple machines. |
Note: Editable fields, except Moved-To Machine No., update the production order routing line record of the production order line you are dealing with on this page. Any future schedule generations or regenerations use these modified values. The Moved-To Machine No. is written to one of the schedule results tables and is only considered when you either:
- regenerate the schedule result you made the move in or
- made a move in a schedule result that is set to active and the MxAPS setup configuration Consider Past Moves is set to include them.
Schedule Result Tooltips
Field/Control Name | FastTab or FactBox | Caption | Tooltip |
Description | Description | Specifies a user-supplied description for this set of scheduling results. | |
Order Lines | Result Summary FactBox | Order Lines | Specifies the count of the number of production order lines in this result. |
Unscheduled Order Lines | Result Summary FactBox | Unscheduled Order Lines | Specifies the number of production order lines have operations that are not scheduled. If more than zero (0) operations of a production order line are unscheduled, that production order line is flagged as unscheduled. |
Late Order Lines | Result Summary FactBox | Late Order Lines | Specifies how many late production order lines are in this result. |
Early Order Lines | Result Summary FactBox | Early Order Lines | Specifies how many early production order lines are in this result. |
On-Time Lines | Result Summary FactBox | On-Time Lines | Specifies how many production order lines are on time in this result. |
Total Setup Time | Result Summary FactBox | Total Setup Time | Specifies the total setup time in this set of results. |
Total Run Time | Result Summary FactBox | Total Run Time | Specifies the total run time in this set of results. |
Work Center No. | Machine Schedule Summary FastTab | Work Center No. | Specifies the work center associated with the machine that the operation is scheduled on. |
No. | Machine Schedule Summary FastTab | Machine No. | Specifies the machine the operation was scheduled on. |
Production Order No. | Machine Schedule Summary FastTab | Production Order No. | Specifies the production order number that is scheduled. |
Operation No. | Machine Schedule Summary FastTab | Operation No. | Specifies the operation number that is scheduled. |
Lot Counter | Machine Schedule Summary FastTab | Lot Counter | Specifies the lot number of the operation that this record applies to. |
Op. Description | Machine Schedule Summary FastTab | Operation Description | Specifies the description of the operation that this record applies to. |
Item No. | Machine Schedule Summary FastTab | Item No. | Specifies the item this production order is for. |
Description | Machine Schedule Summary FastTab | Description | Specifies the description from the production order line. |
Starting Date-Time | Machine Schedule Summary FastTab | Starting Date-Time | Specifies the starting date-time of this lot. |
Ending Date-Time | Machine Schedule Summary FastTab | Ending Date-Time | Specifies the finish date-time of this lot. |
Due Date | Machine Schedule Summary FastTab | Due Date | Specifies the due date of the production order routing line. |
Lot Duration (Hours) | Machine Schedule Summary FastTab | Lot Duration (Hours) | Specifies the duration in hours of this lot of the operation. |
Lot Quantity | Machine Schedule Summary FastTab | Lot Quantity | Specifies the lot quantity for this lot. When transfer lot scheduling is not enabled, this is the production order line quantity base. |
Balance Lot Quantity | Machine Schedule Summary FastTab | Balance Lot Quantity | Specifies the remaining lot quantity for this lot. |
Quantity | Machine Schedule Summary FastTab | Quantity Completed | Specifies the difference between the lot quantity and the balance lot quantity. |
Class No. | Machine Schedule Summary FastTab | Class | Specifies the class code used in scheduling this operation. |
Priority | Machine Schedule Summary FastTab | Priority | Specifies the priority used in scheduling this operation. |
Order Set No. | Machine Schedule Summary FastTab | Order Set No. | Specifies the order set code that was used to schedule this operation. |
Moved | Machine Schedule Summary FastTab | Moved | Specifies whether the operation has been moved manually. |
Moved-To Machine No. | Machine Schedule Summary FastTab | Moved-To Machine No. | Specifies the machine that the operation was moved to. |
Split Quantity | Machine Schedule Summary FastTab | Split Quantity | Specifies the split quantity. |
User1 | Machine Schedule Summary FastTab | User1 | Specifies custom attribute 1 of the Prod. Order Routing Line. |
User2 | Machine Schedule Summary FastTab | User2 | Specifies custom attribute 2 of the Prod. Order Routing Line. |
User3 | Machine Schedule Summary FastTab | User3 | Specifies custom attribute 3 of the Prod. Order Routing Line. |
Lot Duration | Machine Schedule Summary FastTab | Lot Duration | Specifies the duration of this lot of the operation. |
User9 | Machine Schedule Summary FastTab | User9 | Specifies custom attribute 9 of the Prod. Order Routing Line. |
User8 | Machine Schedule Summary FastTab | User8 | Specifies custom attribute 8 of the Prod. Order Routing Line. |
User7 | Machine Schedule Summary FastTab | User7 | Specifies custom attribute 7 of the Prod. Order Routing Line. |
User6 | Machine Schedule Summary FastTab | User6 | Specifies custom attribute 6 of the Prod. Order Routing Line. |
User5 | Machine Schedule Summary FastTab | User5 | Specifies custom attribute 5 of the Prod. Order Routing Line. |
User4 | Machine Schedule Summary FastTab | User4 | Specifies custom attribute 4 of the Prod. Order Routing Line. |
Type | Machine Schedule Summary FastTab | Type | Specifies the type of equipment that this event occurs on. |
Total Queue Time | Machine Schedule Summary FastTab | Total Queue Time | Specifies the total floor time of the lot. |
Theoretical Start Date-Time | Machine Schedule Summary FastTab | Theoretical Start Date-Time | Specifies the theoretical earliest start date-time of the operation. |
Starting Date-Time | Machine Schedule Summary FastTab | Starting Date-Time | Specifies the starting date-time of this lot. |
Start After Date-Time | Machine Schedule Summary FastTab | Start After Date-Time | Specifies the earliest start date-time of the operation. |
Shortcut Dimension 2 Code | Machine Schedule Summary FastTab | Shortcut Dimension 2 Code | Specifies the dimension 2 from the production order line. |
Shortcut Dimension 1 Code | Machine Schedule Summary FastTab | Shortcut Dimension 1 Code | Specifies the dimension 1 from the production order line. |
Scheduled | Machine Schedule Summary FastTab | Scheduled | Specifies whether this lot is scheduled. |
Schedule Result No. | Machine Schedule Summary FastTab | Schedule Result No. | Specifies which schedule result this belongs to. |
Rank | Machine Schedule Summary FastTab | Rank | Specifies the rank of this operation. Lower numbers indicate more importance. |
Prod. Order Status | Machine Schedule Summary FastTab | Prod. Order Status | Specifies the status of the production order this record applies to. |
Prod. Order Line No. | Machine Schedule Summary FastTab | Prod. Order Line No. | Specifies the production order line this record applies to. |
Previous Type | Machine Schedule Summary FastTab | Previous Type | Specifies the type of equipment the previous operation is scheduled on. |
Previous No. | Machine Schedule Summary FastTab | Previous No. | Specifies the machine the previous operation is scheduled on. |
Prev. Production Order No. | Machine Schedule Summary FastTab | Prev. Production Order No. | Specifies the previous production order that influences this operation. |
Prev. Prod. Oder Status | Machine Schedule Summary FastTab | Prev. Prod. Oder Status | Specifies the status of the previous production order that influences this operation. |
Prev. Prod. Oder Line No. | Machine Schedule Summary FastTab | Prev. Prod. Oder Line No. | Specifies the previous production order line number that influences this operation. |
Prev. Operation No. | Machine Schedule Summary FastTab | Prev. Operation No. | Specifies the previous operation that influences this operation. |
Prev. Item No. | Machine Schedule Summary FastTab | Prev. Item No. | Specifies the item of the previous production order line that influences this operation. |
Operation Time Saved | Machine Schedule Summary FastTab | Operation Time Saved | Specifies the operation duration saved by using the part or order family. |
Operation Finish Date | Machine Schedule Summary FastTab | Operation Finish Date | Specifies the finish date for the operation. |
No. of Scheduled Lots | Machine Schedule Summary FastTab | No. of Scheduled Lots | Specifies the actual number of scheduled lots. |
Netted Queue Time With Blocks | Machine Schedule Summary FastTab | Netted Queue Time With Blocks | Specifies the same as netted queue time except machine/work center blocks are not excluded from the calculated queue time. |
Netted Queue Time | Machine Schedule Summary FastTab | Netted Queue Time | Specifies the netted queue time. All machine downtime between the scheduled and theoretical start times is excluded from the calculation as per the machine shift definition, the plant calendar, and relevant machine/work center blocks. |
Moved-To Machine Type | Machine Schedule Summary FastTab | Moved-To Machine Type | Specifies the type of equipment that the operation was moved to. |
Move Date-Time | Machine Schedule Summary FastTab | Move Date-Time | Specifies the date-time for the move. The operation can not be scheduled any earlier than this. |
Lot Family No. | Machine Schedule Summary FastTab | Lot Family No. | Specifies the family code that was used in scheduling this operation. |
Lot Complete | Machine Schedule Summary FastTab | Lot Complete | Specifies whether the lot is complete. |
Locked | Machine Schedule Summary FastTab | Locked | Specifies whether the operation is locked on the machine. Locked operations are only allowed to schedule on the machine they are locked on. |
Late Time Allowed | Machine Schedule Summary FastTab | Late Time Allowed | Specifies the number of days after the due date that the production order can finish without violating the just in time heuristic. |
Internal Machine | Machine Schedule Summary FastTab | Internal Machine | Specifies whether this operation was scheduled on an internal machine. |
In Process | Machine Schedule Summary FastTab | In Process | Specifies whether the operation is in process. |
Entry No. | Machine Schedule Summary FastTab | Entry No. | Specifies the individual result detail. |
Early Time Allowed | Machine Schedule Summary FastTab | Early Time Allowed | Specifies the number of days before the due date that the production order can finish without violating the just in time heuristic. |
Description 2 | Machine Schedule Summary FastTab | Description 2 | Specifies the description 2 from the production order line. |
Copy Work Center No. | Machine Schedule Summary FastTab | Copy Work Center No. | Specifies the work center from which the times are calculated when an operation is manually moved. |
Copy Machine No. | Machine Schedule Summary FastTab | Copy Machine No. | Specifies the machine from which the times are calculated when an operation is manually moved. |
Lot Complete | Machine Schedule Summary FastTab | Lot Complete | Specifies whether the lot is complete. |
Common Routing Link Code | Machine Schedule Summary FastTab | Common Routing Link Code | Specifies the common operation code used if an order set was used in scheduling. |
Active | Machine Schedule Summary FastTab | Active | Specifies whether this operation was considered to be active. |