Getting Started with MxAPS

Skip to main content

Getting Started with MxAPS

You are here:

MxAPS

MxAPS is a finite-capacity advanced planning and scheduling solution for Microsoft Dynamics 365 Business Central. Use the resources below to install and configure MxAPS, understand how scheduling decisions are made, generate and review schedules, configure constraints, optimize sequencing, and troubleshoot unexpected results.

Getting Started, Installation, and Administration

Understanding How MxAPS Scheduling Works

Start here to understand the fundamental scheduling behavior of MxAPS, including finite forward scheduling, constraints, lead times, and the reasons operations may move.

Generating and Controlling a Schedule

Use these articles when deciding what MxAPS should schedule and how a schedule should be generated.

Scheduling Rules, Priorities, and Sequencing

Scheduling rules determine which production orders MxAPS attempts to schedule first. These articles cover ranking, sequencing, grouping, and order attributes.

Capacity, Machines, Labor, and Other Resources

Configure the capacity and resource constraints that determine where and when an operation can run.

Inventory and Material Constraints

MxAPS can consider available inventory and component requirements when determining when production can begin.

Calendars, Availability, and Transfers

Use these features to model when resources are available and the time required to move work between resources.

Setup Time and Changeover Optimization

MxAPS can sequence compatible jobs and eliminate eligible setup time to produce a more efficient schedule.

Reviewing and Analyzing Schedule Results

After generating a schedule, use these pages and tools to understand where orders and operations were placed and why.

Modifying and Committing the Schedule

MxAPS calculates the schedule, while users can review or adjust the result before committing scheduling changes back to Business Central.

Troubleshooting

If the generated schedule does not match expectations, start with the troubleshooting guide and then review the constraint-specific articles above.

Advanced and Integration Topics

Related Graphical Scheduler Articles

MxAPS calculates and sequences the production schedule. Graphical Scheduler provides the visual scheduling interface used to review production operations and, where permitted, make manual scheduling changes. The following Graphical Scheduler articles are particularly relevant when using the two applications together.

Was this article helpful?
0 out Of 5 Stars
5 Stars 0%
4 Stars 0%
3 Stars 0%
2 Stars 0%
1 Stars 0%
5
How can we improve this article?
Please submit the reason for your vote so that we can improve the article.
Need help?
Tags:

Leave A Comment

Table of Contents
Go to Top