---
title: "Order Attribute Schedules"
app: "MxAPS"
section: "How-to guides"
last_updated: "2021-07-15"
url: "https://insight-works.com/kb/mxaps/iwxmxapsorderattrsched-page-al/"
---

# Order Attribute Schedules

The _MxAPS Order Attribute Schedules_ page contains details about attributes used in the scheduling rule to generate the rank, or scheduling priority, of every operation for a production order.

### Order Attribute Schedules Tooltips

| **Field/Control Name** | **FastTab or FactBox** | **Caption** | **Tooltip** |
| --- | --- | --- | --- |
| Production Order No. |   | Production Order No. | Specifies the production order number. |
| Item No. |   | Item No. | Specifies the Item this production order is for. |
| Description |   | Description | Specifies the description from the production order line. |
| Operation No. |   | Operation No. | Specifies the operation that this record applies to. |
| Op. Description |   | Operation Description | Specifies the description of the operation that this record applies to. |
| Rank |   | Rank | Specifies the rank of this operation. |
| Start Date-Time |   | Starting Date-Time | Specifies the start date and time of this operation. |
| Finish Date-Time |   | Ending Date-Time | Specifies the ending date and time of this operation. |
| Scheduled |   | Scheduled | Specifies whether the operation was scheduled. |
| Critical Ratio |   | Critical Ratio | Specifies the ratio between the time available to process a production order and the processing time for the order. |
| Days Overdue |   | Overdue By | Specifies the number of days between the operation due date and the operation ending date. |
| Operation Moved |   | Operation Moved | Specifies the movement status of the operation. |
| Slack Time (Hours) |   | Slack Time (Hours) | Specifies the total amount of hours the production order can spend waiting. This is calculated as: Slack = (Due Date – Schedule Base Date) – Cycle Time |
| Slack Time |   | Slack Time | Specifies the total amount of time the production order can spend waiting. This is calculated as: Slack = (Due Date – Schedule Base Date) – Cycle Time |
| Updated Orders |   | Updated Orders | Specifies whether the operation had production reported against it. In the current release, this is always read false as only quantity or status updates are applied. |
| Shortcut Dimension 2 Code |   | Shortcut Dimension 2 Code | Specifies the dimension 2 from the production order line. |
| Shortcut Dimension 1 Code |   | Shortcut Dimension 1 Code | Specifies the dimension 1 from the production order line. |
| Prod. Order Status |   | Prod. Order Status | Specifies the status of the production order this record applies to. |
| Prod. Order Line No. |   | Prod. Order Line No. | Specifies the production order line number. |
| Op. Description |   | Operation Description | Specifies the description of the operation that this record applies to. |
| Description 2 |   | Description 2 | Specifies the description 2 from the production order line. |
