---
title: "Task and Routing Configuration"
app: "Maintenance Manager"
section: "Set up"
last_updated: "2026-11-12"
url: "https://insight-works.com/kb/maintenance-manager/task-and-routing-configuration/"
---

# Task and Routing Configuration

### Task types and template creation

Tasks define what maintenance activity must be performed, when it must be triggered, and what_resources_ (BOMs, routings, labor) are required.

| Task Type | Description | Template |
| --- | --- | --- |
| Preventative | Ongoing, recurring PM tasks. | Pre-defined base templates for recurring PM tasks across fleets. |
| Corrective | Ad-hoc breakdown or break-fix tasks. | Standardized templates for common breakdown requests (e.g., chain repair). |

- Preventative: Ongoing, recurring tasks driven by runtime, output, duration, or distance intervals.
- Corrective: Single-use breakdown tasks generated in response to equipment failures or ad-hoc requests.
- Preventative Template: Master task configurations used to clone standard preventative schedules, BOMs, and routings onto multiple equipment items without serving as active task triggers themselves.
- Corrective Template: Standardized breakdown templates (e.g., standard chain repair, and motor swap) pre-configured with standard routings and components to streamline rapid breakdown order creation.

### General setup

Add a relevant description of the Task and any default Priority if necessary. Maintenance Order Tasks carry the default Setup Order number series; however, you can also update this per task if using the number series to help identify orders.

### Maintenance BOMs and routings

Tasks link to Maintenance BOMs (e.g. replacement parts, seals, lubricants) and Maintenance Routings (e.g. labor operations, safety steps, time standards). These can be as detailed or as generic as required. All Maintenance Orders created from this task use these values to populate the orders.

 Note: At the minimum, you must have a Routing defined as a placeholder work center.

#### Mechanics of Placeholder Work Center 999 and fallback logic

Master maintenance routings often apply to dozens of identical physical machines across a facility. To eliminate creating separate routings for every machine:

1. Configure the master Routing operation line using **Placeholder Work Center**(there is one installed via default setup package).
2. When a Maintenance Order is generated for a specific Equipment Item, the Maintenance Manager engine inspects the Equipment Item Card’s linked Capacity Center (Capacity Type and Capacity No**.**).
3. The system dynamically replaces this placeholder on the generated order line with the specific physical Work Center or Machine Center assigned to that individual Equipment Item (e.g., Machine Center 10), booking scheduled maintenance time directly against the machine’s capacity calendar. If there is no specific Capacity No. defined on the Equipment Item, this operation is deleted.

### Maintenance interval types and threshold setup

Preventative tasks monitor equipment usage through four distinct **Interval Types**:

1. Runtime: Automatically accumulated based on production order operation execution time (minutes, hours, or days) logged against the Work Center or Machine Center linked to the Equipment Item from standard Production Orders.
2. Output Count: Automatically accumulated based on finished item output quantities posted against capacity centers linked to the Equipment Item from standard Production Orders.
3. Duration: Calendar-driven intervals calculated relative to the Equipment Item’s Activation Date (or last completed maintenance date). Supports Days, Weeks, Months, and Years. Work Days are defined from the Companies Base Calendar to exclude “Non-Working Days” from the calculation.
4. Distance: Manual counter tracking for operational metrics not natively generated by manufacturing production orders (e.g., vehicle mileage, kilometers or operating hours).

   - Distance counters are updated during all other Preventative Maintenance Orders (e.g., a weekly walk-around PM checklist order). When executing those other Maintenance Orders, the technician enters the current physical counter value (e.g., 13,000 Miles) into the distance counter field on the Maintenance Order. Upon posting, the system updates the cumulative counter value on the Equipment Item Card.

#### Threshold and range parameters

- Size: Defines the trigger threshold value (e.g., 5000 Hours, 6 Months, and 10000 Miles).
- Effective Ranges (Start and End): Defines active counter thresholds to accommodate aging machinery. Leaving _Start_ and _End_ fields as 0 / blank keeps the interval threshold effective indefinitely.

   - Aging Asset Example Setup: An initial range (Start 0 to End 100000 hours) uses an interval Size of 5000 hours. A secondary range (Start 95000 to End 500000 hours) lowers the interval Size to 4000 hours as the machinery ages, triggering more frequent PMs.

### Assignments

Ability here to either add Maintenance Equipment items individually or through a bulk assign feature from the actions menu.
