# Create and Manage Tasks in Maintenance Manager

### Create corrective maintenance tasks

1. Select **Maintenance Request** on the main Business Central page.
2. Input the required details:

   - Maintenance Equipment Item No.
   - Task Description
   - Priority Code
3. Select **OK**.

### Create preventative maintenance tasks

1. Select **Maintenance Task** on the Business Central page.
2. Select **New**.
3. Define the following in the _General_section:

   - Task Description
   - Maintenance Type: Corrective (no scheduling, one time), Preventive (all options), or Template (used to create multiple similar tasks from, no assignments).
   - Production BOM No. and Routing No.: Create/select appropriate records associated to the Maintenance Task that are used when creating Maintenance Orders (not what is listed on the Equipment Item Card). Ensure that the placeholder work center is listed in the routings.
   - Maintenance Order Nos.: Default in the Setup page; however, you can adjust to be a specific type of number series as required for when orders are created.
4. Define the following in the _Schedule_ section:

   - Last Maintenance Date & Priority Code: Reference information.
   - Type and Output Count Unit of Measure: Options of Distance (km-/miles-/meters-based manual tracking recorded from completed maintenance orders), Runtime or Quantity (min/hr/day/qty with automatic updates from Capacity Type/No. as non-maintenance production orders are posted), Duration (day/week/month/year and works from the activation date forward).
   - Size: the frequency of when maintenance is performed; this value needs to be passed to trigger the “Maintenance Due” flag.
   - Effective Range Start and Effective Range End: If left as zero, values for both are treated to last indefinitely. If these are populated, this is the range of when the maintenance triggers. If the values are outside of the listed range start/end, maintenance does not trigger.
5. Select the _Maintenance Due_ checkbox to assign the maintenance task.

 Note: If you have multiple ranges for a task, ensure there is an overlap between the ranges to prevent missed maintenance (e.g., with a size of 100 and range start/end of 0/1000, the last maintenance triggered is 900, and a second maintenance task would be required with a start/end of 900/2000 and size of 100 to trigger the 1000-mark maintenance). Note: Apply all multiple maintenance tasks by selecting **Bulk Assign** and selecting **OK**.