---
title: "Display Service Order Allocations in Graphical Scheduler"
app: "Graphical Scheduler"
section: "How-to guides"
last_updated: "2025-03-04"
url: "https://insight-works.com/kb/graphical-scheduler/display-service-order-allocations-in-graphical-scheduler/"
---

# Display Service Order Allocations in Graphical Scheduler

Complete the following steps below to display service order allocations that allow changes:

1. Start Graphical Scheduler in Business Central.
2. Select **View**.
3. Select **+New**.
4. Enter a name and description (e.g., “SERVICEORDERALLOC” and “Service order allocations”).
5. Select **Add a Data Source**.
6. Select **Anything (any custom table)**.
7. ​Locate the _What Is It_ group / _Table No._
8. Input “59650” (or use the **…** (Assist Edit) button to find “Service Order Allocation”).
9. Select the **…** (Assist Edit) button and select “Document No.” in the _Document No. Field_.
10. Locate the _When Is It_ section / _Starting Date-Time _field.
11. Select the **…** (Assist Edit) button and select “Allocation Date”.
12. Locate the _Where Is It_ section / _Show In__ _field.
13. Select the **…** (Assist Edit) button and select “Miscellaneous”.
14. Select “Resource No.” in the _Capacity No.__ _field.
15. Allow dragging and dropping if desired.
16. Allow view to be write-able and allow changing the resource (optional):

   1. Locate the _Writing Changes (general)_ section / _Allowing Changes_ field / set to “Allow Writes”.
   2. Locate the _What Order to Change Fields When Writing_ section and add the _Capacity No._ field, which maps to “Resource No.” (allows changing the resource but not the date).
   3. Add the _Starting Date-Time_ field (allows changing the allocation date).
17. Return to the main view screen and remove the data source for production order routing lines (added automatically).

You can now see resources on the left-hand side and service order allocations plotted in the middle.
