---
title: "Change the Production Order Status from the Graphical Scheduler"
app: "Graphical Scheduler"
section: "How-to guides"
last_updated: "2023-12-21"
url: "https://insight-works.com/kb/graphical-scheduler/change-the-production-order-status-from-the-graphical-scheduler/"
---

# Change the Production Order Status from the Graphical Scheduler

Note: This article presumes you are visualizing standard production order routing lines in your Graphical Scheduler as a pre-requisite.

The default view in a Graphical Scheduler install shows production order routing lines. Change the Production Order Status from Graphical Scheduler by completing the following:

1. Navigate to Graphical Scheduler in Business Central.
2. Select the required production order routing line’s cell.
3. Select **Details** and select **Change Status**.
4. Modify the following fields, as needed:

   - New Status
   - Posting Date
   - Update Unit Cost
5. Select **Yes** and select **Close**.
