Skip to content

Product Configurator Feature Requests

Add the option to launch the IW Product Configurator from the Project Task Card

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #9019
    Javier D.

    <p class=”xmsonormal”><span style=”font-size: 11.0pt;”>The same way, as the Product Configurator is launched from a Sales Quote or a Sales Order… to create Sales Lines with the configurations…. </span></p>
    have the option to be able to launch it from the Project Task Card… to create Planning Lines with the Configured Item.
    <p class=”xmsonormal”>Sabre Limited works with many customers using the Projects module, and some of them would be interested in this capability.</p>

Viewing 1 post (of 1 total)
  • Sign in below to reply.